My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
3500 - Local Oversight Program
>
PR0545561
>
ARCHIVED REPORTS_XR0013008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:41:42 PM
Creation date
3/17/2020 4:25:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013008
RECORD_ID
PR0545561
PE
3528
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
02
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
struction project team for the Sheldon Oil Company Miner Avenue- Stockton Site bioremediation <br /> project provides for: <br /> V ' <br /> 1 Establishment of clear lines of communications, <br /> • Established project management systems and reporting, <br /> • Clear and consistent schedule control, <br /> • Strict adherence to QA/QC protocols <br /> # Project Oversight <br /> 4 <br /> Pat Cullen, Registered Geologist with Brown and Caldwell will provide technical oversight for all <br /> aspects of the remediation project including sampling protocols. <br /> Project Manager <br /> Project activities at the Sheldon - Stockton Site will be under the direction of Robert H. <br /> Meaders MD. Dr. Meaders, developer of the FyreZyme7m bioremediation system, will be respon- <br /> sible for the implementation of the work plan and the coordination of all on-site activities. His <br /> responsibilities will include: <br /> • Coordinating and scheduling the project (determining when, where, size and con- <br /> tent of the work crews, and materials); <br /> • Coordinating application of the FyreZyme'technology. <br /> • Specifying, coordinating and scheduling appropriate types of equipment needed to <br /> perform the work; <br /> • Ensuring that all reporting and recordkeeping is complete; <br /> • Maintaining the log book of clean-up activities. <br /> Field Superintendent <br /> Field Superintendent Jim Asbel will manage the construction operations his responsibilities will <br /> include: <br /> Complete on-site responsibility reporting to the project manager; <br /> Supervising the personnel and assigning work duties; <br /> • Handling of all day-to-day operational problems involved with the job; <br /> • Ensuring that all reporting and recordkeeping is complete; <br /> • Maintaining the log book of clean-up activities. <br /> [ Assuring that safety procedures in effect are in compliance with all appropriate <br /> federal, state, and company regulations <br /> • Assuring that appropriate hazard areas are identified and well marked; <br /> • Assuring that all personnel entering areas are in appropriate levels of protection; <br /> • Assuring that visitors comply with site safety regulations. <br /> 4 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.