Laserfiche WebLink
• 4' <br /> TABLE 1 <br /> Chronology of Significant Events <br /> Tank Pull Through Remediation <br /> Golden Grain Company <br /> Manteca, California <br /> Event Date of Event Description Report Reference <br /> Tank Pull November'17, 1986 Removal of 700-gallon, regular leaded Manteca Bean, Co Tank Removal Chemical <br /> fuel tank, associated piping and Test Results and Recommendations for <br /> dispenser. Additional Soil and Groundwater <br /> investigations, SCS Engineers, December <br /> 1986 <br /> Preliminary January- March 1987 Drilled and Installed 4 monitoring wells Interim Report of Monitoring Well Installations, <br /> Assessment (W-1 through W-4). Manteca Bean Company, SCS Engineers, <br /> April 1987 <br /> Additional April - June 1987 Drilled and Installed 2 monitoring wells Progress Report of Subsurface Investigations, <br /> Assessment (W-5 and W-6) Manteca Bean Company, SCS Engineers, <br /> July 1987 <br /> Additional December 1987 Drilled and installed 2 additional Report <br /> Additional <br /> Bean Compall <br /> ny, SCS <br /> Assessment monitoring wells(W-7 and W-8) <br /> Enginbers, March 1988 <br /> Soil Vapor Survey August 30, A soil gas survey was conducted for the Soli Gas Survey, Golden Grain Company, <br /> September 1, 1989 purpose of defining the extent of the GTEL Environmental Laboratories, <br /> free-phase hydrocarbon plume. September 1989 <br /> Additional November 1989 Drilled and installed 6 additional wells Problem Assessment Report, Manteca Bean <br /> Assessment (MW-9 through MW-14). Facllity, Groundwater Technology, Inc. <br /> December 1989 <br /> a2o2 MCS <br />