My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005124
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0005124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 10:32:18 PM
Creation date
3/17/2020 4:46:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005124
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Third Quarter 1996 Status Report 3 <br /> Golden Grain Company,Manteca Bean'Facility.229 Moffat Boulevard Manteca Calitomia September 17,19% <br /> TREATMENT SYSTEM OPERATION AND MAINTENANCE <br /> ' The sod treatment system remained inactive this quarter because of the lack of Influent soil vapor <br /> concentrations detected during the first quarter of the year The groundwater treatment system, <br /> ' however, operated continuously during the quarter The system consists of two liquid-phase granular <br /> activated carbon (GAC) vessels arranged in senes which treat groundwater extracted from well <br /> RW 1 <br /> During the quarter, seven site visits were made to perform maintenance and routine system <br /> operation The following work was performed during each site visit <br /> ■ monitoring and recording operational data for the groundwater treatment system and <br /> ' making adjustments as necessary <br /> ■ monitoring the condition of the catalytic water conditioner which minimizes fouling caused <br /> ' by the hardness of the water <br /> ■ monitoring the liquid-phase GAC vessels and filters for pressure build up <br /> �i <br /> During this quarter of operation, there were no releases of untreated groundwater <br /> ' GROUNDWATER TREATMENT SYSTEM MONITORING <br /> ' A total of 461,102 gallons of water was treated between June 1, 1996, and August 28, 1996 Since <br /> the beginning of operation of the remediation system, approximately 5,335,987 gallons of water have <br /> ' been extracted and treated <br /> On August 8, 1996, samples were collected from the groundwater treatment system and analyzed for <br /> TPH-g. BTEX, total lead, organic lead, and ethylene dibromide at a Califomia-certified laboratory <br /> Laboratory analytical reports and corresponding chain-of-custody records for the sampling event are <br /> ' included in attachment 4 Results of system historical analyses are summarized in table 3 <br /> Laboratory results indicate that all treatment system effluent water constituents analyzed were below <br /> ' the method detection limit and below the City of Manteca Public Works Department Industrial <br /> Wastewater Discharge Permit (No 92-2) limits <br /> ' 20200213 QS3 <br /> IFLUOM DAP411111.071 <br /> tip1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.