My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005128
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0005128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:13:16 PM
Creation date
3/17/2020 4:48:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005128
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1 <br /> f tE G, , € 1riLlY, 1 <br /> D❑� GROUNDWATER 29 PM 2 0 <br /> 2 <br /> DEDTECHNOLOGY ® Groundwater Technology,Inc <br /> 4057 Port Chicago Highway,Concord,CA 94520 USA <br /> September 25, 1995 Tel (510}671-2387 Fax (510)685-9148 <br /> Ms Linda Turkett <br /> San Joaquin County Public Health Services <br /> 445 N San Joaquin Street <br /> Stockton, CA 95201 <br /> Subject Third Quarter 1995 Status Report <br /> Golden Grain Company, Manteca Bean Facility <br /> 229 Moffat Boulevard, Manteca, California <br /> GTI Project 042020190 <br /> Dear Ms Turkett <br /> On behalf of Golden Grain Company, Groundwater Technology, Inc, has prepared this Third <br /> Quarter 1995 Status Report on groundwater and soil conditions at the Manteca Bean Facility in <br /> Manteca, California (attachment 1, figure 1), for the quarter ending September 8, 1995 The field <br /> . work included weekly treatment system operation and maintenance through August 23, 1995, along <br /> with quarterly groundwater monitoring and sampling After August 23, the site was visited twice <br /> each month because of changes in system configuration and operation <br /> The groundwater monitoring and sampling results enabled evaluation of the groundwater gradient <br /> and distribution of dissolved hydrocarbons in groundwater Groundwater monitoring data and <br /> results of laboratory analyses of groundwater samples collected on August 18, 1995, are included <br /> All work was performed as described in a monitoring and sampling plan approved by San Joaquin <br /> County Public Health Services on February 27, 1992 <br /> In addition to quarterly monitoring and sampling activities, the soil and groundwater remediation <br /> system was operated and maintained during this quarter Details regarding the operation of the <br /> system through September 8, 1995, including the system efficiency and future remediation plans for <br /> the site are discussed below <br /> MONITORING WELL GAUGING <br /> r � <br /> Before well purging and water sample collection on August 18, 1995, Groundwater Technology <br /> personnel gauged all of the site wells to measure the depth to water and the depth to <br /> .� separate-phase hydrocarbons, if present (attachment 2, table 1) The well gauging was conducted <br /> 42020102 QTR <br /> Offices throughout the US,Canada and Overseas <br />
The URL can be used to link to this page
Your browser does not support the video tag.