Laserfiche WebLink
Second quarter 1995 Status Report 5 <br /> Golden Grain Company, Manteca Bean Facility, 229 Moffat Blvd, Manteca,CA June 20, 1995 <br /> CONTINUED OPERATION <br /> Site work for the next quarter will include dally system check via modem, weekly site visits for <br /> equipment operation and maintenance, weekly monitoring of system operating conditions and vapor <br /> influent and effluent concentrations, quarterly monitoring and sampling of site wells, and quarterly <br /> sampling of treatment system influent and effluent groundwater streams Also, quarterly vapor <br /> extraction monitoring and induced vacuum readings will be measured The treatment system is <br /> expected to operate under normal conditions during the next quarter <br /> If you have any questions or comments regarding this report, please call our Concord office at <br /> (510) 671-2387 <br /> Sincerely, <br /> Groundwater Technology, Inc Groundwater Technology, Inc. <br /> Submitted by Approve <br /> ij <br /> kCJ�W <br /> opher R De ocio aures Grasty, R <br /> Project Manager G Senior Geologist <br /> � JAMES W. .� <br /> C GRASW <br /> or <br /> * rank J Gorry <br /> NO.61 �Q' ice President, Operations Manager <br /> CNational Industry Division <br /> � A►-1 <br /> c Mr John Colley, Golden Grain Company <br /> Mr Noah Horowitz, The Quaker Oats Company <br /> Mr Jim Podesta, City of Manteca Public Works Department <br /> Ms Elizabeth Thayer, Regional Water Quality Control Board <br /> Attachments <br /> 1 Figures <br /> 2 Tables <br /> 3 Field Data Collection Form and Vapor Treatment System Mass Removal Calculations <br /> 4 Analytical Laboratory Reports <br /> 42020102 3TR <br /> 11:11:10 GROUNDWATER <br /> ❑❑❑TECHNOLOGY <br />