My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012598
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0012598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:48:13 PM
Creation date
3/17/2020 4:52:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012598
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> GOLDEN GRAIN COMPANY 10 <br /> December 21, 1989 <br /> 202/799-5045.06 <br /> 3.0 WORK PERFORMED <br /> 3.1 SPP REMOVAL AND GROUNDWATER ELEVATION MEASUREMENTS <br /> In May and June 1989, a fire department-approved 250- <br /> gallon, above-ground product tank was installed at the site to <br /> hold recovered SPP and groundwater generated during the purging <br /> process. These materials had been stored on site in Department <br /> of Transportation (DOT)-approved 55-gallon steel drums, and were <br /> transferred into the product lank after it was installed. <br /> To recover SPP from the monitoring wells, bailing was <br /> initiated on June 12, 1989 to remove floating product from MW-1, <br /> MW-2, MW-4, and MW-5. The petroleum was placed into the product <br /> tank. On August 15,1989, the contents of the tank were removed <br /> by Ramos Oil. <br /> r Groundwater elevations in the eight wells installed by SCS <br /> were measured by GTI on March 21, June 12-16, June 19-22, and <br /> June 30, 1985. The measurements in June were accomplished <br /> simultaneously with the SPP removal program. <br /> 3.2 SOIL-VAPOR SURVEY <br /> On August 30, 31, and September 1, 1989, GTI conducted a <br /> soil--vapor survey (SVS) to define the subsurface soil vapor <br /> profile and determine locations for additional monitoring wells. <br /> Soil vapor samples were collected by driving a slotted sampler <br /> _. into the subsurface. A vacuum pump was used to sample air within <br /> - - the soil-interstices.---The--samples-were_-analyzed__onsiten_a <br /> mobile laboratory equipped with a gas chromatograph. Details of <br /> the equipment and methods used are outlined in Appendix Il. <br /> GROUNDWATER <br /> TECHNOLOGY.INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.