Laserfiche WebLink
F <br /> }J <br /> t.r 14 <br /> toluene,ethlybenzene and xylenes(STEX)and total petroleum hydrocarbons-as-gasoline(TPH-G). GTEL <br /> is certified by the State of California to perform these analyses. <br /> Air samples were collected from MW-3,MW-5,and fviW.0 after approximately one hour of testing. <br /> K Vapors were then extracted from MW-2 for 6 days at 130 cim to determine a hydrocarbon concentration <br /> km <br /> 29 <br /> dissipation curve for extracted vapors. <br /> 3.3.2 Soil Vapor Extraction Pilot Test Results <br /> The results of vacuum measurements taken during the soil vapor extraction pilot test are recorded <br /> in Appendix L These vacuum measurements allow definition of the subsurface volume of soil that is <br /> was defined as <br /> affected by the applied vacuum,stated as a radius of influence. The radius of influence <br /> the distance at which measured vacuum would be equal to 0.1 inchos of water. The radius of influence <br /> was graphically determined for each measured condition from a tog-normal plot of vacuum versus <br /> distance (Appendix 1). The results are summarized in Table 1. <br /> _,. TABLE 1 <br /> SOIL VAPOR EY•TRACTION PILOT TEST RESULTS <br /> RADIUS OF INFLUENCE <br /> MANTECA BEAN FACILITY, MANTECA,CALIFORNiA <br /> MAY 8-14,1990 <br /> RADIUS OF INFLUENCE (FEET) <br /> EXTRACTION FLOW RATE <br /> POINT (CFPA) <br /> 130 90 <br /> MW-2 75 <br /> I MW-2 65 55 <br /> MW-2 37 80 <br /> MW-3 130 90 <br /> MW-5 130 130 90 <br /> MW-6 <br /> Three different flow rates were tested using MW-21n order to Cetermine the relationship between <br /> the flow rate and the radius of influence. As expected,the radius of influence decreased as the flow rate <br /> was reduced. The graph of flow rate versus radius of influence is in Appendix I,and is used to select the <br /> optimum blower size for the total system. <br /> Table 2 summarizes laboratory analyses of hydrocarbon concentrations in vapor collected <br /> during the pilot test. The five Samples taken from MW-2 were part of the six day test. <br /> -� GR0IJNt)%vxrFR <br /> TECHNOLOGY.INC. <br /> --- eb <br />