Laserfiche WebLink
. Emergency Response Plan: Due to the nature of this work, it is not anticipated that a <br /> catastrophe (e g , explosion, fire, etc.)will occur However, in case of an emergency, the SSO <br /> shall ensure that all personnel working at the site shall know at a minimum the following <br /> evacuation procedures <br /> I If evacuation is necessary, all personnel will proceed to a predetermined location in the <br /> support zone, upwind and upslope(as necessary) of the work zone <br /> THE SIGNAL FOR EVACUATION WILL BE 3 SHORT BLASTS IN <br /> SUCCESSION ON AN AIR OR CAR HORN. <br /> ' 2 Site-specific evacuation incident procedures will be discussed and documented by the <br /> SSO � <br /> 3 Any person requiring medical attention shall be evacuated promptly from any <br /> contaminated area For personnel requiring medical attention, the emergency information <br /> guidelines attached shall be followed <br /> Onsite Monitoring Required ? ■ Yes ❑ No <br /> ' If yes, specify equipment: A photo ionization detector(PID)will be used initially and during <br /> drilling activities as required to insure safety Any sustained readings above 25 part per million <br /> (ppm)3n the breathing zone will require upgrading to level C protection Readings sustained <br /> above 250 ppm will require the operation to be stopped and local Health and Safety to be <br /> ' contacted <br /> Site Personnel: <br /> NAME TITLE RESPONSIBILITY <br /> iI <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> ' 6 <br /> 7 <br /> G <br />