My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005075
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
466
>
3500 - Local Oversight Program
>
PR0545571
>
ARCHIVED REPORTS_XR0005075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:24:36 AM
Creation date
3/18/2020 3:51:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005075
RECORD_ID
PR0545571
PE
3528
FACILITY_ID
FA0003570
FACILITY_NAME
BOBS MUFFLER & RADIATOR
STREET_NUMBER
466
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
APN
22104019
CURRENT_STATUS
02
SITE_LOCATION
466 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced. <br /> GeoEnvironmental, In = - <br /> 1 <br /> 01 March 2001 <br /> AGE-NC Project No. 98-0520 <br /> Ms. Lori Duncan <br /> SAN JOAQUIN COUNTY PHS-EHD <br /> 304 East Weber Avenue, 3`d Floor <br /> Stockton, CA 95201 <br /> Subject: Modified Additional Site Assessment Work Plan Addendum-November 2000 <br /> BOB'S MUFFLER SHOP <br /> 466 Moffat Road,Manteca, California <br /> Dear Ms. Duncan: <br /> Results of the quarterly ground water monitoring events to date indicate that the ground water gradient is <br /> relatively flat and that ground water flow direction apparently varies, flowing either easterly or westerly. <br /> Pursuant to your letter dated 22 December 2001, the original.Additional Site Assessment Work Plan <br /> Addendum,dated November 2000,has been modified to include the installation of two additional monitoring <br /> wells(labeled PMW-9 and PMW-10)north and east of the project site(Figure 1)along with the monitoring <br /> wells in the original plan. Methodology for monitoring well installation and sampling is described in the <br /> work plan prepared by Advanced GeoEnvironmental, Inc. (AGE) titled Preliminary Site Assessment Work <br /> Plan, dated 30 November 1998. <br /> If you have any questions or require further information,please contact bur office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br /> J <br /> Calvin F. Lee <br /> Project Geologist , <br /> cc: Mr. Tom Barbour-Bob's Muffler Shop <br /> Mr. Mark List-CVRWQCB <br /> 837 Shaw Road,Stockton, California 95215 <br /> Telephone (209) 467-1006 FAX(209)467-1118 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.