Laserfiche WebLink
14 Januar 2004 <br /> • Y <br /> AGE-NC Project No. 98-0520 , <br /> Page 4 of 4 <br /> ' The AGE-prepared Additional Site Assessment Work Plan-February 2003,dated 11 February 2003 <br /> was approved by the EHD, with conditions by letter dated 20 March 2003. AGE has the work <br /> scheduled for January 2004. <br /> 1 <br /> 6.0. • LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by ,, <br /> environmental consultants practicing in this or similar localities.The findings were based upon"field <br /> ' measurements and analytical-results provided by an independent laboratory. Evaluations of the <br /> hydrogeologic conditions at the site for the purpose of this investigation are made from a limited <br /> number of available data points (i.e. ground water samples) and subsurface conditions may vary <br /> away from these data points.No other warranty,expressed or implied,is made as to the professional <br /> interpretations, opinions and recommendations contained in this report. <br /> Advanced GeoEnvironmental,Inc. <br />