Laserfiche WebLink
05 June 2003 <br /> AGE-NC Project No. 98-0520 <br /> Page 4 of 4 <br /> ' S.O. RECOMMENDATIONS <br /> Based upon data collected from the site, AGE recommends continued quarterly ground water <br /> monitoring. The next quarterly monitoring event is scheduled for June 2003. <br /> The AGE-prepared Additional Site Assessment Work Plan-February 2003,dated 11 February 2003 <br /> was approved by the EHD, with conditions by letter dated 20 March 2003. AGE will apply to the <br /> UST Cleanup Fund for cost approval and begin permit preparation for the approved work. <br /> 6.0. LIMITATIONS <br /> 1 -Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities.The findings were based upon field <br /> measurements and analytical results provided.by an independent laboratory. Evaluations of the <br /> bydrogeologic conditions at the site for the purpose of this investigation are made from a limited <br /> number of available data points (i.e. ground water samples) and subsurface conditions may vary <br /> away from these data points.No other warranty,expressed or implied,is made.as to the professional <br /> interpretations, opinions and recommendations contained in this report. <br /> 1 <br /> 1 <br /> 1 � <br /> 1 <br /> Advanced GeoEnvironmental,Inc. <br />