My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005043
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
757
>
3500 - Local Oversight Program
>
PR0545572
>
ARCHIVED REPORTS_XR0005043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:20:33 AM
Creation date
3/18/2020 4:32:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005043
RECORD_ID
PR0545572
PE
3528
FACILITY_ID
FA0006855
FACILITY_NAME
ECKERT COLD STORAGE COMPANY
STREET_NUMBER
757
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95366
APN
22104041
CURRENT_STATUS
02
SITE_LOCATION
757 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF° Envlronmental Consultants, Inc. <br /> Uealth & Safety Plan for Eckert Cold Storage, <br /> Manteca, California <br /> 1.4 Health and Safety Plan <br /> WHF Environmental Consultants, Inc has adopted the following health and safety procedures for <br /> working with organic vapors and liquid contaminants encountered during drilling and excavation <br /> of subsurface soil The purpose of this program is to provide health and safety precautions for the <br /> ' initial and subsequent site visits until the nature and magnitude of the contaminants have been <br /> defined <br /> 1 1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation of sae clean-ups will <br /> have an assigned rzspunsibtlity The outlined responsibilities will establish standards for <br /> personnel protective wear, safety procedilies and provide for emergency actions wluch <br /> ,• could arise during project operations <br /> 1 2 Prgjert Alalrag,er(PJ) <br /> ' �- - c 5 all project o etations Project Manager (PM), to cooperation <br /> The Pro}ti.,t�'Cann�cr dt.e t p J p <br /> with the Project .safety Officer (PSO), has the primary responsibility for onsurtng that the <br /> safety plan is read, sign,;d, tnd fully understood by all employees and outside persons <br /> allowed around or within designated working perimeters of the job site <br /> 1 In cooperation with the PSO, lie is responsible for ensuring that at all timt.s during project <br /> operations, all employees adhere strictly to the Health and Safety Plan <br /> 13 Project Safety Officer (PSO) <br /> The PSO shall direct and ensure that all employees comply with the Health and Safety <br /> Plan The PSO has the primary responsibility for <br /> ' l Assuring that appropriate personnel protective equipment is available and properly <br /> utilized by all on-site personnel <br /> 2 Assuring that personnel air awai a of the provisions of this plant, are instructed in <br /> the wok practices nece4sary to ensure safety, and in planned procedures for <br /> • dealing with ensengenctes <br />
The URL can be used to link to this page
Your browser does not support the video tag.