Laserfiche WebLink
WHFEnvironmental i oyioiots, Inc. • <br /> Health d Safety Plan for Lckert Cold Storage <br /> Page .3 <br /> 2.4 Safety Implementation <br /> The provisions of the 1N:YF Environmental Consultants, Inc Health and Safety Plan are <br /> mandatory for all personne' asset fated with the site project and operations <br /> A complete background review and site visitation will be conducted in order to determine whether <br /> ' specific amendments are to be made to the Health and Safety Plan based on specific <br /> characteristics which may exist on the job site Any suspected hazards associated with the on-site <br /> operation which exposure to, via inhalation or skin absorption, to such as suspected carcinogens <br /> or human stertlants, will be documented and specific guidance will be developed and added to this <br /> Health and Safety Plan as Appendices <br /> ' A defined project site layout is paramount to the safe completion of all remedial site <br /> investigations The project site layout has built-in safety features The site is divided into three <br /> zones The following list defines the required personnel protective equipment <br /> ' 21 Personnel Protective Equipment (PPE) <br /> 10 Personnel who will be working in or around the exclusion zone of the job site will use the <br /> following protective equipment and measures as warrant by the Project Manager <br /> ' • Cove,alts as as undergarment <br /> • Saranex outer garment <br /> i Sample gloves (inner) <br /> • PVC, Nitrile or Neoprene outer gloves <br /> t • bard tiat <br /> • Steel toe boots <br /> • Robara or "Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic vapor, <br /> acid gas, pesticide, radionuclide, high efficiency filter) Note that cartridges should <br /> be changed daily <br /> * All joints to be taped <br /> i ' Self-contained air will be utilized if project dictates <br /> ' More stringent protective equipment requirements mill be implemented if necessary This <br /> determination will be made by the project supervisor after review of the materials to be <br /> handled, the ambient rionilonng data, consultation v%ith on-site technical personnel, the <br /> ' Safety Officer, and (tie proper management personnel Upgrades in PPE, if necessary, will <br /> be implemen►ed <br />