Laserfiche WebLink
10 INTRODUCTION TABLE OF CONTENTS <br /> 1 <br /> 11 Purpose 1 <br /> ' 12 Scope of Work 2 <br /> 20 PROJECT BACKGROUND INFORMATION 3 <br /> ' 2 1 Site Location and Description 3 <br /> 2 2 Site History 4 <br /> 2 3 Tank Closure Results 4 <br /> 2 4 Phase I Hydrogeologic Investigation Results 7 <br /> 2 5 Site Water Supply Well 9 <br /> 2 6 Utilities 9 <br /> 2 7 Water Supply Well Inventory 9 <br /> ' 2 8 Regional Geology and Hydrogeology 12 <br /> 30 HYDROGEOLOGIC INVESTIGATIVE RESULTS 12 <br /> ' 31 Site Geology 12 <br /> 3 2 Soil Sample Collection and Screening 13 <br /> 3 3 Soil Sample Analytical Results 13 <br /> 3 4 Monitoring Well Information 14 <br /> ' 40 DISCUSSION AND INVESTIGATION RESULTS 15 <br /> 41 Distribution of Petroleum Hydrocarbon Constituents in Soil 15 <br /> 4 2 Distribution of Dissolved Constituents in Ground Water 16 <br /> 50 CONCLUSION 16 <br /> ' 60 REMARKS/SIGNATURES 17 <br /> ' Tahles <br /> TABLE 1 Under Ground Storage Tank Information 4 <br /> ' TABLE 2 Total Organic Vapors in Parts Per Million From Pretank Pull Soil Assessment 5 <br /> TABLE 3 Chemical Analysis of Soil Samples From Bottom of Former Tank Excavation (ppm) 6 <br /> TABLE 4 Chemical Analysis of Soil Sample From the Product Line Trenches (ppm) 7 <br /> ' TABLE 5 Chemical Analysis of Soil Samples Collected From Soil Borings Drilled on 8 <br /> August 8, 1989 <br /> TABLE 6 Water Supply Well Inventory 10 <br /> TABLE 7 Chemical Analyses of Soil Samples Collected From Soil Borings Drilled on 14 <br /> ' August 1 and 2,1990 <br /> 1 <br /> ' i <br />