Laserfiche WebLink
P+RurN. <br />ENVIROT <br />r.� , y <br />s: .a <br />ta::. :< <br />c��iFoaNvP Donna K. Heran, R.E.H.S. <br />Director <br />Laurie A. Cotulla, R.E.H.S. <br />Assistant Director <br />PART <br />GENERAL SITE INFORMATION <br />.'IENTAL HEALTH4f)EPARTMENT <br />SAN JOAQUIN COUNTY <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202 <br />Telephone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Web: www.sjgov.org/ehd <br />SITE HEALTH & SAFETY PLAN <br />Program Coordinators <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Kasey L. Foley, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Jeff Carruesco, R.E.H.S. <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />Site Name: Miracle Mile Dry Cleaning }, E.hemiesls Hazards <br />Address: 82 W Castle <br />❑ Carcinogens: PERC <br />Contact Person: Yvonne Wilton Phone No: (Click here and typel ❑ Corrosives: [Click here and typel <br />Sweeps Number: [Click here and type] <br />❑ Dusts: (Click here and type] <br />Proposed Date of investigation/inspection: 12-16-08 ❑ Explosives: (Click here and tvnel <br />2. Description and brief narrative of inspection activity: <br />❑ New UST installation.. <br />❑ UAR Investigation. <br />❑ Tank Closure in Place.. <br />❑ Tank/Pipe Repair. <br />❑ Tank/Pipe Removal. <br />❑ Re -excavation. <br />❑ Installation of Borings / Monitoring <br />Wells. <br />❑ Hazardous waste inspection <br />❑ Sampling <br />❑ Tiered Permitting inspection <br />3. Specific Site Information: <br />Tank No.: (Click here and typel Tank Capacity:[Click here and typel <br />Tank Content: [Click here and typel Tank Age: [Click here and type] <br />Other: [Click here and typel <br />4. Type of Operation: Dry Cleaning <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES ❑ NO <br />Documented Groundwater contamination: ❑ YES ❑ NO <br />Background and description of any previous investigation or incidence: <br />[Click here and typel <br />6. Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />❑ Heat or Cold Stress:[Click here and typel °F (high ambient temp.) <br />❑ Noise Sources: (Click here and typel <br />❑ Oxygen Deficiency: (Click here and typel <br />❑ Excavation: (falls, trips, slipping, cave-ins): [Click here and type] <br />❑ Handling and Transfer of a Hazardous Substance: (tire, explosions, <br />etc..): [Click here and typel <br />❑ Confined space entry: (explosions): [Click here and typel <br />❑ Heavy equipment (physical injury & trauma resulting from moving <br />equipment): [Click here and type] <br />❑ Other, specify: [Click here and typel <br />,Anticipated Biological Hazards: <br />❑ Snakes ❑ Insects ❑ Rodents ❑ Poisonous Plants <br />❑ Other/Unknown (specify): [Click here and typel <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.) <br />EH 23081 (02/19/03) <br />❑ Flammables: 77:2 <br />❑ Inorganic Gases: [Click here and typel <br />❑ Metals: [Click here and typel <br />❑ Oxidizers: [Click here and Npel_ <br />❑ PCB's: [Click here and typel <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />1. Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes (Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />Stay away from hazards <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B ❑ C ® D <br />® Hard Hat. <br />® Safety Glasses/goggles. <br />® Steel toed/shank shoes or boots. <br />❑ Flame retardant coveralls. <br />® Hearing protection. <br />❑ Tyvek. <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: [Clickhere and type] <br />® Safety vest. <br />❑ Two-way communication. <br />PART IV - PLAN APPROVAL <br />Plan Prepared by: Garrett Backus Date: 12-16-08 <br />Plan Approved by: <br />Date: <br />