Laserfiche WebLink
x: <br /> 100' tape, owing to fencer, buildings and stored equipment, <br /> the measurements are approximate only. <br /> The three auger holes were drilled u- californiaosplit spoon <br /> 6 1/4" ID hollow sinal OD, <br /> tem auger and a 2" <br /> sampler. All auger flights were steam cleaned at the shoo <br /> and brought to the location clean. core samples were taken <br /> at 5 ft. intervals by driving the sampler out the end of the <br /> hollow stein auger and retrieving by cat head line. <br /> Any equipment reused was washed in a 3 step system using TSP <br /> in the first waih and rinsed <br /> i sedwertfinaln the two <br /> were collected each location, <br /> long by 2" diameter samples <br /> ss tubes, Teflon end covers an <br /> using laboratory supplied bra <br /> plastic caps with the best sample chosen for testing. All <br /> samples were sealed with duct tape, labeled and pacers in <br /> the coolein <br /> r chest. 6" brass tubes were used for space <br /> the core barrel (only 6" of care was collected) • <br /> approximate locations of the actual samples are marked on <br /> the sample logs. All samples were examined for odor and <br /> visual contamination, described, sealed with Teflon enabeled <br /> cover cloth and plastic caps, sealed with duct tape, <br /> and placed in the cooler chest. All samples were collected <br /> by Dennis Allen, CEG. <br /> WELL DRILLING, SAMPLING, AND COMPLETION OPERATIONS <br /> MW # 1 <br /> The location was moved about 10 feet southwesterly from that <br /> proposed owing to nearby overhead power lines . The site was <br /> about S feet from the original excavation and the original <br /> sample site that showed some slight contamination. <br /> r <br /> Drilling operatiotts commenced at about 10: AN. Aertion <br /> opas <br /> was cut out )f the 2" asphalt cover and boring p <br /> proceeded, The well was auger drilled to about 35ocbyl , <br /> with split spoon cores taken at 5 intervals; appr <br /> imately <br /> 5 ' 10' 151 , 20' and 25' bgl . The water table was located <br /> by the driller at about 25'-26' bgl • For reference, see <br /> th <br /> log and completion diagram for MW # 1 (Figure 2) cuttings <br /> were placed in 55 gallon drums with locking covers and <br /> stored on site until test results are available. <br /> The soils are described as follows: From the asphalt cover <br /> to --2 1/21 , moist, dark brown silty-sand, fine coarse to med <br /> nd <br /> grained; from -2 1ium- <br /> /2to' -5' , brown, <br /> pebbles; -5' to- 15' , silty sands, some coarse material; <br /> -15' to about --15 1/2' , light tan clay; -cl 1/2' to -1gummy, <br /> medium to coarse sand; -18' to -25' , tan clay' moist, gummy, <br /> streak of sandy clay at -20' to -21 1/2' ; -25 ' 26 1/2' , <br /> to - <br /> b -- - --- uaatz-_sand,__ water at about -25 to -26' , <br /> wt coarse;_-blue-grey -�1 T•-p, } , <br /> level thendromoist,o se t -but norobviousom -26 lwateroin3cuttings. <br /> ani <br /> clayey- <br /> 3 <br />