Laserfiche WebLink
r <br /> 15 YOWIMM <br /> 0- <br /> ACTIONS RECOMMENDED AFTER WELL COMPLETION AND TESTING <br /> After the results of the soil and water sample testing <br /> hA ve <br /> been analyzed, a follow-up report should be prep <br /> ared that <br /> will show geologic sections prepared from the boring logs, <br /> along with the sample results . <br /> If the monitoring well water samples all show no evidence of <br /> contamination, it could be concluded that none exists , <br /> regardless of the direction of water flow. The monotao£rof� <br /> well adjacent to the former tank site should be p <br /> that. If contamination is found, as noted°theab�ve, one Or <br /> needed to �r}o+e <br /> other monitoring weals off-site might <br /> delineate the ase, noffurtnernactionseshould beftakeny <br /> proves to be the he c <br /> until a discussion has been <br /> held <br /> dowith the EFID and the <br /> Regional Water Quality <br /> If no contaminates are found in the three wells, they <br /> should be resampled on a quarterly basis for one year <br /> (through one rainy season) , to determine if pollutants b <br /> that might be present in the current vadose zone have been <br /> leached and/or migrated to the water table. <br /> J,0 <br /> Dennis R. Allen ct' C.";''". ._iEt1 `°•+ <br /> Certified Engineering Geologist, # 169 <br /> 4 <br />