Laserfiche WebLink
X <br /> �I ACTIONS RECOMMENDED AFTER WELL COMPLETION AND TESTING <br /> After the results of the soil and water sample testing have <br /> been analyzed, a follow-up report should be prepared that <br /> will show geologic sections prepared from the boring logs, <br /> along with the sample results. <br /> If the monitoring well water samples all show no evidence of <br /> contamination, it could be concluded that none exists, <br /> regardless of the direction of water flow. The monitoring <br /> well adjacent to the former tank site should be proof of <br /> that. If contamination is found, as noted above, one or more <br /> other monitoring wells off-site might then be needed to <br /> delineate the direction of the contaminate plume. I£ such <br /> proves to be the case, no further actions should be taken <br /> until a discussion has been held with the EHD and the <br /> E Regional Water Quality Control Board. <br /> ! If no co%taminates are found in the three wells, they <br /> should b.: resampled on a quarterly basis for one year <br /> (through one rainy season) , to determine if pollutants <br /> that might ba present in the current vadose zone have been <br /> leached and/or migrated to the water. table, <br /> gra` In <br /> Dennis R. Allen <br /> sj Certified Engineering Geologist, 169 <br /> g g g <br /> { <br /> r' <br /> r <br /> rR. <br /> 3; <br /> n - <br /> �1 <br /> i <br /> r <br /> f it <br />