Laserfiche WebLink
I, k/ <br /> C A M B R i A Mr Harkin Knoll <br /> • June S, 2005 <br /> ANTICIPATED SECOND QUARTER 2005 ACTIVITIES <br /> Over-Excavation Following removal of the USTs, dispensers, and piping, Cambria conducted <br /> over-excavation and soil sampling in the gasoline UST excavation on April 7, 2005 Cambria <br /> submitted an Underground Storage Tank Removal and Over-Excavation Report on June 3, 2005 <br /> Groundwater Monitoring Blaine will gauge and sample the site wells and tabulate the data <br /> Cambria will prepare a groundwater monitoring report <br /> Well Destructions On May 12, 2005, Cambria submitted a Work Plan Addendum proposing the <br /> destruction of wells MW-8 and MW-9 SJCEHD approved the work plan in their May 18, 2005 <br /> letter Cambria is scheduled to destroy these wells on June 23, 2005 <br /> Deep Well Installation Cambria's May 12, 2005 Work Plan Addendum, discussed above, also <br /> proposed installing one deep well on site Cambria will schedule this field work and submit a <br /> drilling permit application to SJCEHD <br /> iCLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510)420-3336 <br /> Sincerely, Y K <br /> Cambria Environmental Technology, inc <br /> ��� No. 7659 <br /> Aubrey "Coo P G P <br /> Project Geologist <br /> Figures 1 - Site Vicinity/Receptor Survey Map <br /> 2 - Groundwater Elevation Contour Map <br /> Attachment A- Blaine Groundwater Monitoring Report and Field Notes <br /> cc Denis Brown, Shell Oil Products US, 20945 S Wilmington Ave , Carson, CA 908101 <br /> James Barton, Central Valley Regional Water Quality Control,Board, 11020 Sun Center <br /> Drive, #200, Rancho Cordova, CA 95670 1 1 1 <br /> Angle Balap (Property Owner), 7700 Moreland Street, Stockton, CA 95212 <br /> I, ' EI <br /> G\Stockton 7700 Morel and\QMRS\2005\Ig05\igO5gm doe d <br /> I I I I <br /> 2 <br /> E <br />