Laserfiche WebLink
iY <br /> a <br /> T�HLE OF CONTENTS <br /> f <br /> } 1.0 INTRODUCTION 1 <br /> 1.1 -Purpose 1 <br /> F„ 1.2 Scope of Work 1 <br /> e>R 2.013ACKGROUND INFORMATION 2 <br /> 21 Previous Reports <br /> 2.2 Site History 3 <br /> 2.3 Utilities 3 <br /> 2.4 Water Supply Well Inventory 4 <br /> 2,5 Regional Geology and Hydrogeology 7 <br /> rc 2^6 Site Geology <br /> V Results of Previous Site Assessments 7 <br /> i 3.0 PROPOSED WORK PLAN 11 <br /> 3.1 Soil Sample Collection and Screening 11 <br /> t i 3.2 Monitoring Well Installation 11 <br /> r wa� 3.3 Chemical Analysis 11 ; <br /> 4.0 SCHEDULE <br /> 11 <br /> 5.0 REMARKS/SIGNATURES <br /> i <br /> 12 s <br /> Tables <br /> TABLE 1 Tank Information f <br /> TABLE 2 Water Supply Well inventory 3 <br /> 4 <br /> TABLE 3 Chemical Analysis of Soil Samples Taken From the Bottom of the g <br /> f Former Tank Excavation <br /> TABLE 4 Chemical Analysis of Sol[ Samples Taken From the Product Lane Trenches 9 <br /> Ia TABLE 5 . Chemical.Analysis of Soil Samples Collected From Soil Borings g <br /> IS Drilled on August 8, 1989 :t <br /> w <br /> Ft urea <br /> ks FIGURE 1 Site Location Map <br /> FIGURE 2 Site Map With Soil Boring and Sampling Locations <br /> { FIGURE 3 Crass-Section Location Map g <br /> FIGURE 4 Geologic Cross-Section A-A' <br /> FIGURE 5 Typical Monitoring Well Construction Specifications <br /> # Appe <br /> ndlces <br /> APPENDIX A Laboratory Data Sheets for Sail Samples Collected From Soil Borings SB-7.and SB-B <br /> �o f' APPENDIX B L.aboratoryData'Sheets for a Water Sample Collected From the Site Water Supply Well <br /> APPENDIX C Septic Tank and Seepage Pit Permits ' <br /> APPENDIX D Methods and Quality Assurance Plan <br /> i � <br />