My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT AND SUMMARY OF PROJECT TO DATE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2900 - Site Mitigation Program
>
PR0524586
>
ARCHIVED REPORTS_LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT AND SUMMARY OF PROJECT TO DATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:26:04 AM
Creation date
3/19/2020 2:40:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT AND SUMMARY OF PROJECT TO DATE
RECORD_ID
PR0524586
PE
2950
FACILITY_ID
FA0016498
FACILITY_NAME
LUCKY J DAIRY
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
95391
APN
20906008
CURRENT_STATUS
02
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ponds. I have personally inspected the Dairy on four.occasions. On October 17, 200C, <br /> 2 1 shot elevations of the Dairy using laser transiting equipment. The purpose o <br /> 0 3 shooting elevations of the Dairy, was to determine elevations for the siting of nevr <br /> 4 containment ponds. <br /> 5 4. Once we completed the shooting of elevations, the information was <br /> 6 transmitted by Mr. Kimbrough to Dan Schack, a civil engineer hired b3 <br /> 7 Mr. Kimbrough. Mr. Schack will prepare plans for the improvements which will b <br /> 8 constructed at the Dairy. I understand that the preliminary plans call for th <br /> 9 construction of two new manure containment ponds of approximately 1.2millio <br /> 10 cubic feet each. In addition, I understand that we will be grading the corrals, <br /> 11 constructing perimeter berms and inspecting the existing pond berms and reinforcing <br /> 12 them as necessary. <br /> 13 5. At the present time,we expect to begin construction toward the end of they <br /> 14 week of November 15, 2000, subject to weather conditions. The project will take <br /> 15 approximately two weeks to complete. <br /> 16 1 declare under penalty of perjury that the foregoing is true and correct. <br /> 17 Executed on this,�Z day of October, 2000 at Manteca, California. <br /> 18 <br /> 19 R SILVERIA1 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25, <br /> 26 <br /> 27 <br /> W 0.8 <br /> 6µ1FN <br /> n0 2 <br /> Declaration of Ron Silveria in Support of Defendants'Objections to Plaintiffs'Proposed Decision <br />
The URL can be used to link to this page
Your browser does not support the video tag.