My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004959
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MUNFORD
>
3755
>
3500 - Local Oversight Program
>
PR0545591
>
ARCHIVED REPORTS_XR0004959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 12:04:46 AM
Creation date
3/19/2020 4:32:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004959
RECORD_ID
PR0545591
PE
3526
FACILITY_ID
FA0005972
FACILITY_NAME
DICK MAU TRUCKING
STREET_NUMBER
3755
STREET_NAME
MUNFORD
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3755 MUNFORD AVE
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V � <br /> A S S O C I A T E S I N C <br /> In December 2000, ATC personnel supervised the advancement of one cone penetrometer (CPT) <br /> boring to 140 feet bgs Also in December 2000 ATC personnel supervised the advancement of <br /> four soil borings to 80 feet bgs and one soil boring to 100 feet bgs The soil borings were <br /> converted into groundwater monitoring wells Analytical results of soil samples and <br /> groundwater samples indicated that soil and groundwater are impacted by petroleum <br /> hydrocarbons Site activities were summarized in ATC's Summary Report of Additional <br /> Subsurface Investigation, dated March 6, 2001 <br /> In September 2001, ATC supervised the advancement of four geoprobe soil borings, SBI <br /> through SB4, and eight hollow stem auger borings Soil borings SBI through SB4 were <br /> advanced first encountered groundwater, approximately 61 feet bgs, boring AS 1 was advanced to <br /> approximately 85 feet bgs, borings PZ1a and PZIb were advanced to approximately 80 feet bgs, <br /> borings VW1, VW2, and VW3 were advanced to approximately 65 5 feet bgs, and borings MW9 <br /> and MW 10 were advanced to approximately 81 feet bgs Soil boring AS 1 was completed as a <br /> 4-inch diameter air sparge well with two 2-inch diameter piezometers located in the same <br /> borehole Soil borings PZ 1 a and PZ 1 b were completed as 2-inch diameter piezometer pairs <br /> Soil borings VW1, VW2, and VW3 were completed as a 2-inch diameter vapor extraction wells <br /> and borings MW9 and MW 10 was completed as a 2-inch diameter groundwater monitoring well <br /> • On October 31 and November 1, 2001, ATC performed a short-term vapor extraction test and a <br /> long-term vapor extraction test On the first day, a short-term vapor extraction test was <br /> approximately 2 hours in length and on the second day, a long-term vapor extraction test was <br /> approximately 4 hours in length The soil vapor extraction pilot test yielded a radius of influence <br /> of approximately 50 feet Approximately 13 7 pounds of TPHg and benzene were removed <br /> during the 6-hour combined vapor extraction pilot tests <br /> In December 2001 and January 2002, ATC conducted an air sparge pilot test at the site, running <br /> for approximately 31 days Well ASI was used to evaluate the site-specific radius of influence <br /> created by a density driven convection (DDC) well at the site The air sparge test yielded a <br /> radius of influence of approximately 20 feet Approximately 0 28 pounds of TPHg and benzene <br /> were removed during one day of the air sparge pilot test and this yielded a removal of 8 68 <br /> pounds of TPHg and benzene during the 31-day pilot test The details and results of the air <br /> sparge pilot test, vapor extraction tests, and the iri allation of the air sparge wells, vapor <br /> extraction wells, and the groundwater monitoring well MW 10 are described in ATC's Remedial <br /> Investigation/Feasibility Study, Pacific Coast Recreation, 3755 Munford Avenue, Stockton, <br /> California, August 13, 2002 <br /> SAMPLING ACTIVITIES <br /> • On June 25, 2002, ATC personnel collected groundwater samples from monitoring wells MW1, <br /> MW3 through MW10, and the on-site groundwater supply well DW A groundwater sample was <br /> not collected from well MW2 because of the presence of floating free product in the well The <br /> w U63931quan1y12gr-2002 doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.