Laserfiche WebLink
h <br /> GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> ROJECT NAME , PROJECT NUMBER � 3 O0Xs WELL NO MSL ` <br /> PROJECT MANAGER '6\J I TYPE OF WELL ✓Monitoring Extraction Other <br /> RECORDED BY kf� SAMPLED BY / -r DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well using Diameter <br /> 2-inch 4-inch Other Bailer - Type ; <br /> Well Tata!Depth -1 (Z– feet below Top of Casing,TD � Pump - Type (jI M),Rdk6 a <br /> Other - Specify <br /> Depth to Water S r�Z feet below Top of Casing,WL Hydroyarbon Odors <br /> Water Column Length�0 feet Yes No <br /> Purges Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> t'q t C 0 X _0� X = evil 05— Calculated Purge Volume = /Q, e7� allons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = allons <br /> Multlolter (Cas4rfg Diameter riches = Gallonsllineai foot 2=017 4=Q6e 6=1 5 a=2-6 <br /> Groundwater Parameter Measurement Meter Typ alibrated Yes_No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEMP `URB1DrrY REDOX COMMENTS <br /> TIME (GPM) (ft) zmhowcm &TID (NTL!) mV f`_ <br /> aft t, s�. zlde-TF- <br /> (qJ7soIL a NA, CLgA <br /> �p 7V <br /> -3 rltaoQ' 0,el <br /> a O ' <br /> raj 1 � 7 <br /> !aa rZ o r8 ,q <br /> \%AWASSOCIA `E'S INC. <br /> FJIYIRONMEWAL,GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />