Laserfiche WebLink
vai u <br /> WORK REQUEST FORM <br /> Date of Request 022403 Requested Completion Date 030303 <br /> Prod Name- Pacific Coast Recreation Prod No 54 16393 0002 <br /> Site Address. 3755 Munford Aver Stockton Task 01 <br /> Project Manager Drew Van Allen Field Tech Alex F <br /> Client Contact Hanan Fradkin Phone No 467-3486 <br /> Regulatory Contact Victoria McCartney Phone No 468•-343 <br /> Approval 1)AAml Completion Date• s S O IFS A ^� <br /> Notify Client contact and Regulator 48 hrs prior to field work <br /> Monitor DTW/DTB in all ten gw m,orutoring wells and facility well <br /> Purge and sample all wells MW-1-10 and facility well in order <br /> Monitor MW-2 with oil/water probe, do not sample,if FPLH is present.. <br /> . Monitor hydroskimmer, remove recovered product <br /> Momtormg order MW-9, 5, 10, 4, 7, 8, 1, DW, 6, 3 & 2 <br /> Purge nd sample all wells„in the same order <br /> Monitor for DO with YSI 95 in all wells <br /> Contain well purged water Reuse drums from MW9 and 5 ND last MS (12/02 <br /> Take four drums <br /> Sample DW influent, ICC and 2CC effluent <br /> Sample all wells for BTEX/TPHg_and Oxygenates by EPA 8260B <br /> Samples to Argon Labs Note in C-0-C-to report MTBE at lowest detection Limit <br /> possible and to_submit e-data in Geotracker format Global ED # T0607700046 <br /> Inspect particulate filters and replace as needed <br /> All wells are two-mch, dtw last (12/02) —67-69', dtb —79'_102' <br /> Prepare purchase order requisition form Af- <br /> . AFLORESTACCOAST doc <br />