Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br />' PROJECT INFORMATION <br /> PROJECT NAME ���� �� C4�5}' PROJECT NUMBER `� `3f:�Z--WELL NO �s <br />' PROJECT MANAGER TYPE OF WELL V'�' Monitoring Extraction Other <br /> RECORDED BY 9 SAMPLED BY DATE b Z S Q <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> 2Well sing Diameter <br /> -inch 4-inch Other --t�f Bader - Type <br /> w - `.p Pump - Type <br />' Well Total Depth 6 feet below Top of Casing,TO Other - Specify <br /> Depth to Water �` feet below Top of Casing,WL Hydrocarbon Odors <br /> Water Column Length j�Q �3' feet Yes P­, No � <br />' Purge Volume Calcutabon (Water Column Length x Multiplier x No Volumes = CalcUa ted Purge Volume) <br /> X T X 3 = t -Z1b Calculated Purge Volume = _-gallons <br />' (WCL) (Multiplier) (No Volumes) Actual Purge Volume = _ 10 2 _ gallons <br /> Multiciler (Casing Diameter ches = Gallonsfkinear foot) 2=0 47 4=0-66 6=9 5 8=2-S <br /> Groundwater Parameter Measurement Meter Type `IS I - 5 Calibrated v�- Yes_No <br />' TIME ELAPSED FLOWRATE DTW pH EC TEMP TUMMY REDOX COMMENTS <br /> TIME (GPM) (ft) 2mhoslcm deg C (NTU) mV <br /> deg F <br /> M I <br /> 3 , a - „3� 1911 <br /> 1 <br /> 1 <br /> VVAKASSOCIATES INC. <br /> ENVIRONMENTAL,GEOTECHNICAL.AND MATEPoALS PROFE=DMALS <br />