Laserfiche WebLink
1 <br /> GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> f1PROJECT NAME �<< ~t PROJECT NUMBER �3ii `s` —�-L VVELL NO JI <br /> t PROJECT MANAGER L)l�� TYPE OF WELL '' Monitoring �^ <br /> Extraction Other <br />' RECORDED BY L UA SAMPLED BY + 'VV.4 DATE O q Z 1 <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well Casing Diameter <br /> t/ 2-inch flinch Other ✓Hailer - Type t -,I- <br /> Of, <br /> I <br />' Well Total Depth - feet below Top of Casing,TO Pump - Type Other - Specify <br /> Depth to Water feet below Top of Casing,WL Hydrocarbon Odors <br /> Water Column Length feet _- Yes No <br />' Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> X ` X �2 Calculated Purge Volume = 6 �� allons <br /> (WCL) (Multiplier) (No Volumes) A&Wal Purge Volume _gallons <br /> Multiplier (Casino Diameter• f c� hesl = Gallons linear foot? Z=0 f7 4=o-e6 S=t 5 8=2e <br />' Groundwater Parameter Measurement: Meter Type 11 3�D Calibrated .-'� Yes_No <br /> TIME ELAPSED I FLOWRATE DTW pH ECTEMP TURBIDITY REDOX COMMENTS <br /> TIME (GP" (ft) arihoslcm deg C tNTU) mV <br /> deq F <br /> 1331- <br /> I"H5 1 -4a od S.Z� $,,,-t <br /> I <br /> I I � <br /> i <br /> i <br /> e <br /> ASSOCIATES INC. <br /> ENVIRONMENTAL,GEOTECUMCAL AND MATERIALS PR0FF�o-LS <br />