My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MUNFORD
>
3755
>
3500 - Local Oversight Program
>
PR0545591
>
ARCHIVED REPORTS_XR0004992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:30:55 AM
Creation date
3/19/2020 4:57:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004992
RECORD_ID
PR0545591
PE
3526
FACILITY_ID
FA0005972
FACILITY_NAME
DICK MAU TRUCKING
STREET_NUMBER
3755
STREET_NAME
MUNFORD
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3755 MUNFORD AVE
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ 8 Shut down IC engine and call Modesto <br /> 9 Submit vapor samples to Sequoia Analytical <br /> l LONG TERM VAPOR EXTRACTION TEST (day two) <br /> 1 Pre-test Procedures� ' <br /> 1 Measure depth-to-water in extraction well (VW3) <br /> 1 2 At extraction wellhead VW3, install PVC riser and alIPin ip g to connect to IC engine <br /> 3 Install pitot tube, gauges, temperature gauge, etc for morutoritng influent stream <br /> 4 Install monitoring caps on all observation wells, hookup magnehelic gauges set to zero <br /> 5 Record vacuum or pressure readings at all momtorirng points prior to testing <br /> Vapor Extraction Test Procedures <br /> ` 1 Start up blower, initiate vapor extraction at low flow and step up flow rate/vacuum <br /> throughout the test at 30 to 60 minute intervals if possible <br /> 2 Monitor flow, temperature, influent and effluent concentrations with FID, vacuum, and <br /> pressure for extraction and observation wells at 15 minute intervals <br /> 3 Monitor response in observation wells at 15-minute intervals <br /> 4 Check knockout drum regularly, empty as needed Reduce/flow vacuum if pulling to <br /> much water <br /> r 1 5 Collect an influent and effluent vapor sample after approximately 15 minutes of operation <br /> L for laboratory analysis of TPHg/BTEX by 8015/8020 and MTBE and oxygenates by <br /> 8260 <br /> 6 Collect an mfluent sample at the end of the test for laboratory analysis of TPHg/BTEX by <br /> 8015/8020 and MTBE and oxygenates by 8260 <br /> _ 7 Vapor extract for two to four hours Continue operation as long as possible until field <br /> readings stabilize or a maximum of four hours <br /> IL 8 Shut down IC engine and call Modesto <br /> 9 Submit vapor samples to Sequoia Analytical <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.