Laserfiche WebLink
3.0 <br /> PHASE II LIMITED SUBSURFACE INVESTIGATION <br /> ERM-West performed ground water sample collection activities on August 26, <br /> and September 7 and 8, 1994. Sample locations were determined during the <br /> Phase I and Regulatory Compliance Audit facility walk-through. The location <br /> of the ground water samples is shown in Figure 3. <br /> 3.1 SCOPE OF WORK <br /> The scope of work ERM-West conducted for this field investigation is shown <br /> below in italics. <br /> Ground water samples were collected from four locations on the subject <br /> property. <br /> Sampling locations were determined by ERM-West personnel during <br /> the Phase I/Audit walk-through. Locations were selected based on an <br /> assumed ground water flow direction toward the southwest (Woodward- <br /> Clyde 1988), and on the location of the wastewater treatment system <br /> and chemical storage area at the subject facility. <br /> Ground water samples were analyzed for volatile orgastic compounds <br /> (VOCs) using EPA methods 8240, semi-volatile organic compounds <br /> (VSOCs) including polynuclear aromatic hydrocarbons (PAHs) using <br /> EPA method 8270, and total and dissolved metals using a combination <br /> of EPA methods 6010 and 7000. The metals analyzed are those named <br /> in the California Code of Regulations Title 22 §66261.24: Ag, As, Ba, <br /> Y' Be, Cd, Co, Cr, Cu, Hg, Mo, Ni, Pb, Sb, Se, Tl, V, Zn. <br /> 3.2 SAMPLE COLLECTION AND ANALYSES <br /> 3.2.1 Methodology <br /> Ground water samples were collected from four locations at the subject <br /> property (LH-1/LH-1R, LH-2, LH-4, and LH-5) employing the cone <br /> penetration testing (CPT)/HydroPunch method. Following collection of <br /> erved at 4°G and remained in the <br /> ground water samples, samples were pres <br /> _ custody of the sampler until submitted to Sequoia Analytical Laboratory for <br /> analyses of VOCs, VSOCs, and total and dissolved metals. The HydroPunch <br /> employed a probe consisting of a 2-inch steel tube equipped with a detachable <br /> 24 uasow.o <br /> ERM-WEST.INC. <br />