My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1443
>
2900 - Site Mitigation Program
>
PR0505371
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 3:09:59 PM
Creation date
3/23/2020 3:08:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505371
PE
2950
FACILITY_ID
FA0006738
FACILITY_NAME
VIKTRON CALIFORNIA
STREET_NUMBER
1443
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330017
CURRENT_STATUS
01
SITE_LOCATION
1443 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' rhe f.. � • <br /> Job Number 2407.02 <br /> HEALTH AND SAFETY PLAN <br /> for Groundwater Sample Collection Activities at <br /> LIKA, Stockton, California <br /> It is the responsibility of the project manager to enforce health and safety <br /> procedures at the site All project personnel must receive a copy of this plan <br /> and sign the form indicating acceptance. <br /> 1. Site Location <br /> This Health and Safety Plan (HSP) has been prepared for the LIKA Facility <br /> located at 1443 Navy Drive, Stockton, CA 95206. "Site" in this Health and <br /> Safety plan refers to the facility identified above. <br /> 2. Key ERM Personnel <br /> Project Manager Kimberly S. Lagomarsino, R.E.A. <br /> Project Geologist/Engineer Kevin S. Depies <br /> Site Safety Officer Kevin S. Depies <br /> Director of Health and Safety Steven Meyers, CIH <br /> 3. Site Description and Background <br /> This Health and Safety Plan has been written to address the health and <br /> safety provisions that will be instituted during cone penetration testing <br /> (CPT)/Hydropunch groundwater sample collection at the site. The site is <br /> paved with asphalt and contains three structures, a circuit board <br /> manufacturing plant, a maintenance shop, and a covered chemical storage <br /> area. <br /> 4. Hazards of Known or Expected Chemicals of Concern <br /> The LIKA Facility manufactures printed circuit boards. There is no history <br /> of spills or unauthorized releases at the facility, and no previous <br /> investigations. Materials used in the manufacturing processes include <br />
The URL can be used to link to this page
Your browser does not support the video tag.