My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVONE
>
3301
>
2900 - Site Mitigation Program
>
PR0505661
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 3:36:25 PM
Creation date
3/23/2020 3:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505661
PE
2950
FACILITY_ID
FA0006928
FACILITY_NAME
U S INTEC INC
STREET_NUMBER
3301
Direction
N
STREET_NAME
NAVONE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
10111065
CURRENT_STATUS
01
SITE_LOCATION
3301 N NAVONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTON REPRESENTATIVES <br /> Organization/Branch NamalTitla Address Telephone <br /> µ/ESTa tit I Denver M11cE ANDERsoO Ails ul.tfor..1 3j-V0 STE SSo <br /> Drotec+ O.re-Fac- <br /> LACEwooa co Soi,ig 303 . 98o• bSOa <br /> WESroQ ) DENVER K-AQ.i*J HO LIwgy XIS UW0.4 Gojo sr£ SSO 303. 9 go. 680o <br /> Prolec+ MQe Ctjer Lilv—Ewoois co Boz.Lg 303.980. 1298 <br /> X AL-0 <br /> vV EsroN NCS (510) 603-7QZ3 <br /> Ac5CS5MehF TraM Le� L';J.) 603-?100 <br /> r <br /> Roles and Responsibilities: PDIPM will ensure that the HASP is prepared and implemented,taking overall responsibility for H&S on <br /> the project. The Assessment Team Leader will ensure that the HASP is implemented,providing all personnel with an overview of <br /> the plan. Team Members will be required to review and adhere to the HASP. <br /> WESTON SUBCONTRACTORS <br /> Organization/Branch Name/Tide Address Telephone <br /> Roles and Responsibilities: Drilling subcontractor will be responsible for installation of soil borings and/or groundwater monitor <br /> wells. All subcontractor personnel will be required to review and adhere to the HASP. <br /> SITE SPECIFIC HEALTH AND SAFETY PERSONNEL <br /> The Site Health and Safety Coordinator(SHSC)for activities to be conducted at this site is: ileo Yc— 71CN')/� <br /> The SHSC has total responsibility for ensuring that the provisions of this Site HASP are adequate and implemented in the field. <br /> Changing field conditions may require decisions to be made concerning adequate protection programs. Therefore, the personnel <br /> assigned as SHSCs are experienced and meet the additional training requirements specified by OSHA in 29 CFR 1910.120 <br /> Qualifications: PHASE 11 ONLY: Minimum of training of 40-hour HAZWOPER,8-hour refresher, SHSC 8-hour course, 24+ hours <br /> in level of protection, 1 at aid/CPR training, Bloodborne pathogen training, and experience in field operations. <br /> Designated alternates include: <br /> Corporate Health and Safety Page 3 of 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.