My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1815
>
2900 - Site Mitigation Program
>
PR0518241
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 3:45:44 PM
Creation date
3/23/2020 3:38:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0518241
PE
2960
FACILITY_ID
FA0013775
FACILITY_NAME
SILGAN CONTAINERS MFG CORP
STREET_NUMBER
1815
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330006
CURRENT_STATUS
01
SITE_LOCATION
1815 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oscar Ilacad ' <br /> Carnation <br /> Monitoring Well Details <br /> Page; 1 <br /> KWITORING WELL ODNSIRUM(W/DEMnPMU <br /> A ground water monitoring well will be completed to a depth of W feet <br /> below the ground water table or 5 feet into any clay layer. The wall will be <br /> constructed of schedule 40, 4" PVC pipe, factory perforated with a minimum of <br /> a 0.020 inch slotted screen which will extend 5 feet below the top of the <br /> upper zone of saturation, unless site conditions require otherwise. <br /> The hole will be finished with a Christy Box grouted with a slope to <br /> about � inch above the existing grade. The well will have a surface seal <br /> extending downward at least four feet from the ground surface within the annu- <br /> lar space, will have a PVC cap to prevent surface contamination, and will be <br /> used during monitoring well construction. After installation, the well will be <br /> developed by pumping or -by- bailing and swabbing. <br /> KWMRING WELL SANE'L.ING <br /> Following an initial water level measurement, the ground water monitoring <br /> well will be sampled using a clean teflon bailer. The bailer will be usedt <br /> first to obtain a sample from the surface of the water in each well prior to <br /> purging. If a layer of product is detected in the bailer, a sample of the <br /> floating product will be collected and analyzed. If no visable product exists <br /> in the well, three to ten well volumes of water will be removed by bailing or <br /> pumping before sample will be collected using a teflon bailer which has been <br /> steam cleaned with distilled water. <br /> All water samples will be sealed in laboratory cleaned glass containers <br /> with teflon lined lids, labeled, and immediately placed in iced storage. A <br /> Chain-of-Custody form will be initiated by the sampler and will accompany the <br /> sample to the analytical laboratory. <br /> `\ `N <br />
The URL can be used to link to this page
Your browser does not support the video tag.