' Former Nelson Read} Mix Page 2 <br /> Groundwater Monitoring Well Construction <br />' GPE Project No 1112 <br /> March 30 2006 <br />' stockpiled on the site for bio-remediation Two of four confirmation soil samples <br /> and the groundwater that accumulated in the pit contained diesel-range <br /> petroleum hydrocarbons The San Joaquin Environmental Health Department <br />' directed that additional investigation of the soil and groundwater be conducted <br /> In a report dated December 23, 2005, ARCADIS, on behalf of LKQ Corporation <br /> documented the installation of three Geo-Probe soil borings and the collection <br />' and testing of soil and groundwater samples One of the borings was advanced <br /> at a point directly through the former tank pit and the other two were at points <br /> south of the pit The highest diesel concentration from a soil sample was 150 <br /> parts per million Groundwater samples from all three borings contained low <br /> concentrations of diesel hydrocarbons ranging from 1,400 to 19,000 parts per <br />' billion Based on these results, the decision was made to construct a suite of <br /> three groundwater monitoring wells at points approximately equidistant from <br /> the former tank pit <br /> Geo-Phase Environmental, Inc assumed responsibility as the environmental <br /> consultant for the investigation on December 22, 2005 On January 17, 2005 a <br /> Work Plan describing methods and protocols to be used in constructing the wells <br /> was submitted to the San Joaquin County Department of Environmental <br /> • Health The Work Plan was approved on January 30, 2006, and subsequently <br /> was executed This report documents the construction and sampling of the <br /> wells, and the completion of a sensitive receptor survey <br /> 1.2 Scope of Work <br />' To further characterize the extent of hydrocarbon contamination from this fuel <br /> release, the following work was completed <br />' • Six composite soil samples were collected from the spoil pile containing <br /> approximately 300 yards of material excavated from around and under <br /> the tank pit Based on the laboratory analytical results, approximately <br /> half of the soil was disposed of on the premises <br /> • Three hollow stem auger borings were drilled to a total depth of 20 feet <br /> fbelow grade The borings were later converted groundwater monitoring <br /> wells The wells were distributed around the point of release The well <br />' borings were logged, and soil samples collected for geologic description <br /> and possible laboratory analysis (see boring logs in Appendix B) <br /> • The borings were converted to groundwater monitoring wells, developed, <br /> • and sampled The resulting groundwater samples were submitted to a <br /> State certified laboratory for analytical testing <br />' 2937 Veneman Ave ,##B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />