Laserfiche WebLink
AECOM <br /> Harlin Knoll <br /> August 13, 2010 <br /> Page 3 <br /> GeoTracker Documentation and Well Completion Reports <br /> AECOM will submit this report describing well decommissioning activities as well as the.laboratory <br /> j" analytical report to the State-of-California GeoTracker database to comply with state requirements. <br /> { + AECOM submitted the Well Completion Reports,No. e0112884 for the UST case wells and <br /> No. e0112962 for the western site wells, to the Department of Water Resources and to the SJCEHD on <br /> August 5, 2010. <br /> Remarks/Signatures <br /> The decommissioning activities complete the case closure process. On behalf of Recology, AECOM <br /> requests issuance of the No Further Action letter. <br /> The interpretations contained in.this report represent AECOM's professional opinions and are based in <br /> part on information supplied by the client. These opinions are based on currently available information <br /> and are arrived at in accordance with currently accepted hydrogeologicand engineering practices at this <br /> time and location. Other than this, no warranty is implied or intended.. <br /> If you have any questions regarding this project, please contact Mark Capps at (916) 361-6405. <br /> Sincerely, <br /> AECOM Environment <br /> Chris Drabandt, G.I.T. Mark Capps, P.G. 6561 <br /> Project Geologist Senior Project Manager ' ( <br /> cc: Ms. Am Dietz Recolo SAA L <br /> Y 9Y tf! <br /> Mr. Jim Munch; Central Valley Water Board <br /> Tables <br /> 1 Well Construction C� <br /> j <br /> Figures <br /> 1 Site Location Map <br /> 2 Site Plan—Eastern Wells <br /> 3 Site Plan—Western Wells <br /> Attachments <br /> A Waste Characterization Laboratory Analytical Report B Certificates of Disposal <br /> �3 <br />