Laserfiche WebLink
CL LOG OF BORING No. MW-3 <br /> y 15 `� DATE DRILLED: 5/25193 ELEVATION: N <br /> cc $ Zrz Q � <br /> EQUIPMENT: OME 75 <br /> None N/A N/A N/A WA al Clayey,yey,nil mod sand,dark greenish-gray,wet, <br /> lected no HC odor <br /> 0 02'slotted PVC casing,4'dia. <br /> 45 #3 Sand Pack <br /> Threaded and cap <br /> a <br /> -TDCD47 <br /> -Very moist to wet C&2& <br /> -Conductor casing placed&grouted 5/25+93 <br /> -Well constructed 5/24/93 <br /> ety -Sand pack surged 15-20 mins <br /> a -2-1/2'Bentonite before hydration <br /> syr -Sand pack from TD to-27"bgs <br /> -Total well depth-48' <br /> Q Q <br /> 60 <br /> 65 <br /> ,r) <br /> 70 <br /> 4 <br /> D <br /> 7 <br /> 75 <br /> O m <br /> THIS SUMMARY APPLIES ONLY AT THE LOCATION OF THIS BORING AND AT THE TIME OF DRLLING SUBSURFACE CONDrrIONS MAY DIFFER AT OTHER LOCATIONS AND <br /> MAY CHANGE AT THIS LOCATION WITH THE PASSAGE OF TIME.THE DATA PRESENTED IS A SIMPLIFICATION OF ACTUAL CONDITIONS ENCOUNTERED. <br /> PROJECT NO <br /> THE PRELIMINARY CLOSURE REPORT 93-117710230 <br /> . MARK STOCKTON SCAVENGERS ASSOCIATION DRAWM No <br /> rib GROUP,INC. STOCKTON, CALIFORNIA A-9 <br /> Q ENGINEERS & GEOLOGISTS <br /> Page 2 <br />