My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006259
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:06 PM
Creation date
3/23/2020 4:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006259
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section No 6 • <br /> Revision No 1 <br /> Date: January 13, 1992 <br /> Page 36 of 55 <br /> ■ Seal cooler with strapping tape Several 12-inch strips are enough <br /> to do the job Place two custody seals- on each cooler,_.. - <br /> e Coolers must be labeled correctly "Fragile" and "This-end-up" <br /> labels go on all four sides of each cooler These labels must be <br /> completely uncovered and clearly 100% visible, <br /> ■ Ship samples. Be sure to keep coolers and airbills organized so <br /> that shipping destinations are correct, <br /> ■ Telephone the analytical laboratory immediately or at the beginning <br /> of the next working day with the airbill numbers, method of <br /> shipment, and the date the samples are shipped <br /> 6 7 Piezometer and Monitoring Well Construction <br /> 6 7 1 General Design Considerations <br /> General design considerations including well location, approximate <br /> depths, well materials, installation methods, will be specified in the Work <br /> _Plan-for.-each-given=task—Several=considerations-dictate-the-construction-- <br /> methods and materials used for the construction of monitoring wells and <br /> piezometers These considerations include <br /> ■ project objectives, <br /> ■ depth of installation, <br /> ■ characteristics of the water-bearing unit, <br /> ■ the presence of chemicals in the subsurface, <br /> ■ the secondary use of the monitoring well and piezometer <br /> 6 7 2 Casing Size, Material, and Installation <br /> Specific well construction details including well casing diameters, <br /> selected casing materials , installation methods and other pertinent well <br /> construction information will be specified in the Work Plan for each given <br /> task Selections of well casing diameters, casing string lengths, casing . <br /> wall thickness, and selection of casing materials will depend on <br /> 6-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.