Laserfiche WebLink
1 <br /> E11��t� <br /> • Mr Jeff Wong <br /> November 17, 2005 <br /> Page 3 <br /> 1 Remarks/Signatures <br />' The interpretations in this report represent our professional opinions and are based, in part, on <br /> information supplied by the client These opinions are based on currently available information <br /> and are arrived at in accordance with currently accepted hydrogeologic and engineering <br /> tpractices at this time and location Other than this, no warranty is implied or intended <br /> If you have any questions regarding this project, please contact Katie Hickimg at (916) 362-7100 <br />' Sincerely, <br /> ENSR Corporation <br /> 1 <br /> Katie Hickling D N Peacock, PhD , P G #7801 <br />' Project Manager Senior Protect Manager <br /> tdAL CaZcO <br /> KHldk O� DAViD PC �0 <br />' • i' PEACOCK <br /> cc Ms Amy Dietz, Norcal Waste Systems, Inc a. <br /> No.7801 n <br /> N� <br /> Attachments <br /> flfi CAL,* <br /> Figures <br /> 1 Site Location Map <br /> 2 Site Map <br /> 3 Groundwater Elevation Contour Map <br /> 4 Groundwater Chemical Concentrations <br /> Tables <br /> 1 Groundwater Monitoring Data and Analytical Results <br /> Attachments <br /> A Field Methods and Procedures <br /> B Groundwater Sampling Information Sheets <br /> C Laboratory Analytical Results with Chain-of-Custody Documentation <br /> D Graph of TPHd, TPHg, Benzene and Groundwater Elevation Versus Time for <br /> MW-2 <br /> • <br />' Celebrating 35 Years of Excellence in Environmental Services <br />