Laserfiche WebLink
in THE <br /> Water Purging & <br /> MARK <br /> CROUP,INC. Sampling <br /> ENGINEERS & GEOLOGISTS <br /> &ate 11,111MM Sample Location M` _Z <br /> Project Name SC L Project No <br /> Weather Conditions 70 <br /> Observations/Comments <br /> Samples Collected By <br /> QUALITY CONTROL <br /> Purging Sampling Method <br /> Method to Measure Water Level <br /> Pump Lines or Bailer/Rope new cleaned < is <br /> Method of Cleaning Bailer/Pump A�19 <br /> pH/Conductance Meter No iS!yr4 _ Date Calibrated <br /> PURGING AND SAMPLING DATA <br /> Water Level (below MP) Start AJA End fV14 <br /> TD = Va CV = zo <br /> Measuring Point (MP) <br /> Time Pump Rate Discharge pH Temp Cond Color Odor Turbidity <br /> (gpm) (gal) Imhoff <br /> /yzs_ <br /> pis^ - 60 <br /> Total Discharge—__ a Casing Volumes y <br /> Method of Disposal of Development Water <br /> Sheet of <br />