Laserfiche WebLink
THE �� O <br /> nirWaMARFC <br /> ter rPurgirng =& <br /> GROUP - - <br /> ENGINEERS a_GEOLOGISTS, 1"C <br /> • Samp��ng Log <br /> Date .. [.� <br /> ' Sample Location _ , <br /> Project Name b ✓ Project No. 2M1 t V <br /> Weather Conditions 444s.+An <br /> Observations/Comments P* Cogg G <br />' Samples Collected By Cg. r1 <br /> QUALITY CONTROL <br /> Purging/Sampling Method w+ A&ALOP lratgwpit � <br /> Method to Measure Water Level 6 ' <br /> E6 P41— <br /> Pump Lines or Bailer Ropes:, new cleaned dedicated <br /> Method of Cleaning Bailer/Pump .,A.,Ar <br />' pH Meter No. Date Calibrated <br /> Sp Conductance Meter No. Date Calibrated <br /> Tib 4(l. PURGING AND SAMPLING DATA <br /> 3 <br /> Water Level (below MP) Start 2113-vf End �$• <br /> ie 13 . 5 43A,16/' Measuring Point (MP) dp d AIG It <br /> Time Pump Rate Discharge pH Temp Sp Cond Color Odor Turbidity <br /> (gpm) (gallons) (•C) Omhos/cm) <br /> Z � <br /> isen <br /> 5 ?•yL ti o <br /> 3 �.aQMt r <br />' tall. 3 10 7.43 a 4 �i <br /> 156 1 b <br />' is 5 <br />' <br /> 0— <br /> Total Discharger. S T Casing Volumes <br /> Method of Disposal of Discharge Water !G71A��AuSaX + <br />' Sheet, L of <br />