Laserfiche WebLink
' THE & <br /> InrilIGROUP MARK <br /> Wader Purging <br />' ENGINEERS a GEOLOGISTS, INC Sampling Log <br /> Date ? ~ / / r Sample Location W ' <br /> Project Name 41 Project No <br /> Weather Conditions <br /> Observations/Comments <br />' Samples Collected By <br /> QUALITY CONTROL <br /> Purging/Sampling Method .7401 6 11 7 <br /> Method to Measure Water Level <br />' Pump Lines or Bailer Ropes:l ne cleaned dedicated <br /> u.�•.•-O��G <br /> Method of Cleanin�g/ Bai[erlllPu tmfp �- /�+ qy <br /> pH Meter No. " ��J g 7 Date Calibrated <br /> Sp Conductance Meter No V Date Calibrated <br /> a i PURGINr. AND SAMPLING DATA <br /> -TS) q I-3.5 w - �/._y.� _ End <br /> Water LeveVoint <br /> MP) Start .�, <br /> Y MeasuringP) <br />' Time Pump Rate' Discharge pH Temp Sp Cond Color Odor Turbidity <br /> (igpm) (gallons) f'Cl (Kmhos/cm) <br />' 7B 7. <br /> 171_ a <br /> o <br /> a <br /> 9 T. n 33 .-D x.0V d 30 7dd /, 4 I <br /> 1 F.p 00 �� � � 'i <br /> 0.1 <br /> � � p -OS b <br />' Q 23' <br /> l <br /> 1 <br /> Total Discharge_— � Casing Volumes <br /> Method of Disposal of Discharge Water O' <br /> Sheet of <br />