Laserfiche WebLink
1r,/ `or, <br /> Case Closure Summary Page 2 <br /> Leaking Underground Fuel Storage Tank Program <br /> III Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH (Gas) NA NA NA NA Xylene .200 <0.005 <0.0005 <0.0005 <br /> TPH (Diesel) 13000 150 19 <.05 Ethylbenzene .470 <0.005 <0.0005 <0.0005 <br /> Benzene <.005 <0.005 <0.0005 <0.0005 Oil &Grease NA NA NA NA <br /> Toluene .097 <0.005 <0.0005 <0.0005 Heavy Metals NA NA NA NA <br /> MTBE NA <0.005 <0.0005 <0.0005 <br /> Comments:The before soil contaminant concentrations are from a sample collected at the time of the UST removal in 1995. <br /> The after soil contaminant concentrations are from SB1 at 19 feet below grade, collected on 11/21/05. The before <br /> groundwater contaminant concentrations are from a geoprobe.grab sample (SB-3) beneath the former UST and dispenser. <br /> The after groundwater contaminant concentrations are from MW-3 located approximately 10 feet outside the excavated area <br /> and downgradient of the former UST and dispenser. 300 cubic yds. of contaminated soil was removed to 19 feet bgs and <br /> approximately 18,874 gal.of water was pumped from the excavation. The soil sample results at 19 feet bgs were below <br /> detection limits. 3 MWs were installed and sampled for three times from Feb. 2006 to Jan. 2007. Analytical results for soil <br /> and groundwater from all 3 MWs were below detection limits. NA means not analyzed. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Pian? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan?Yes <br /> Does corrective action protect public health for current land use?Yes <br /> Site management requirements: NA <br /> Should corrective action be reviewed if land use changes?Yes <br /> Monitoring/Vapor wells decommissioned: No Number Decommissioned: 0 Number retained: 3 <br /> List enforcement actions taken: NOR sent to RPs <br /> List enforcement actions rescinded: NA <br /> V. Local Agency Representative Data <br /> Name: Margaret Lagorio Title: Program Coordinator Unit IV, REHS <br /> Signature: Date: /a-? IO 7 <br /> VI. Central Valle Regional Water QualityControl Board RB Notification [ <br /> Date Submitted to RB: Response Date: <br /> RB Staff: J. Barton Response: <br /> Title: Eng. Geologist <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER,Shall be retained by the lead agency as part of the official <br /> site file. <br />