My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2191
>
3500 - Local Oversight Program
>
PR0545601
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:24:15 PM
Creation date
3/23/2020 4:17:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545601
PE
3528
FACILITY_ID
FA0003588
FACILITY_NAME
EAGLE ROOFING PRODUCTS
STREET_NUMBER
2191
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16331006
CURRENT_STATUS
02
SITE_LOCATION
2191 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$, a. Describe the method that will be utilized to purge and/or inert the tank(s): <br /> Dry ice, Added to tanks , 2O#/ 1 , 000 gal . Diesel <br /> 30#/ 1 , 000 cfal . Gasoline <br /> b. Tank/Piping Hauler <br /> s <br /> Name West Coast Sales <br /> Address 1540 West Linwood City Turlock Zip 95380 <br /> Phone No.( 209-65}8-9378 <br /> Hauler Registration #(if hauled as hazardous) <br /> c. Tank/Piping Disposal Site: <br /> Name Same <br /> Address City Zip <br /> Phone No.( _} <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> Soil samples will be taken from native soils at least_ 2 to 3 feet <br /> under the former tank location with a backhoe bucket . Samples will <br /> be taken from the bucket . <br /> 10, Describe how the excavation will be backfilled with suitable material upon removal: <br /> time . <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> mil n1 astir_ she�tinc <br /> b) What will be the final destination of the excavated stockpile? <br /> S <br /> A--de-termination will b.. mad a time <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> Name T n >7 P n n m P d 1 a t-P r if -f-h_e—need .Halder Registration # <br /> to remove soil exists . <br /> Address { City + Zip <br /> Phone No. ( ), <br /> EH 23 046 (Revised 9/11/96) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.