My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2191
>
3500 - Local Oversight Program
>
PR0545601
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:24:15 PM
Creation date
3/23/2020 4:17:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545601
PE
3528
FACILITY_ID
FA0003588
FACILITY_NAME
EAGLE ROOFING PRODUCTS
STREET_NUMBER
2191
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16331006
CURRENT_STATUS
02
SITE_LOCATION
2191 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
标签
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location rl <br /> Owner—D4.1 ,-.,.}-d.6Pe t E e le um Phone No. 209-943-9011 <br /> _ <br /> Contractor �� n ,�., __ _Phone No. License No.,283424 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> XX I. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> T 2. Submission of verification, e.g.; load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> A. Pea gavel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I .hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion,or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and coinpaged to insure compliance with the Uniform Building Code <br /> Appendix Chapter 74. <br /> Name t) <br /> i <br /> .a. L. <br /> t e tin / <br /> * �' <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.