Laserfiche WebLink
_- .• . - -. -- �, - _ - fir` - � - <br /> 15 June 1999 <br /> ` AGE-NC-Project.No. 98-0534 <br /> Page 11_of-1'3 <br /> 7. <br /> protocols, detail's of whicharepresented below. #. f ', ' .4 <br /> 4.3.1. Static-Water Level Measurements <br /> Before sampling and during quarterly ground water manitonng; static water-level and-free-product' <br /> thickness will`be-measured..using an electric oil/water level indicator. Water_.ievel data'will be, . <br /> r- <br /> recorded to the nearest 0.01 Riot from a reference poinfmarkedbf:the top of the PVCrwell=casing. <br /> .' <br /> Before and after each use;the electric oil/water level indicator will be washed in an- Alcobox solution .- <br /> _ <br /> _ and rinsed with water. <br /> 4.3.2. Well Evacuation - <br />- - ._ . .-• .. -` - :-. '°. .._ -. x ice` _ ., y. -. ;:.�. - T - <br /> Subsequent.to measurement of-Moth to water and prior to:sainpling,,the well will be purged using `o- <br /> T <br /> -a submersible pump to ensure that-the-groundwater-sample is:representative.of the formation, Tattier <br /> ' s <br /> than water standing in the well:casing. The well will be purged until: 1) a minimum of.three-casing' `- <br />� <br /> -volumes isremovedfrom`the well;'and/or..2).the field-mi-e- ground water-.par'meters pH, ; <br /> temperature and,electrical conductivity have stabilized. However, if a well is purged dry prior to txs <br /> evacuating three casing volumes,,a ground water sample will be collected following-80.perceni.. <br /> recovery'of groundwater level'within the well or within$hours of well-evacuation ,.. .i <br /> Purge water;free-product, and decontamination waterp+ener ted=durin the g round water sam lin h Y <br /> g P g g p g . <br /> - activities will be contained in:DOT�approved_drums which wihl be appropriately labeled for storage. <br /> Drums containing purge water will stored on-site pending_appropriate removal and,disposal: , <br /> - n _ :, r <br /> 4.3.3. 'Sample.Withdrawal <br /> - - - Water samples will be collected from.the monitoring wells using disposable polyeihylene:bailer. <br /> These bailers are disposed of after one_use and require no decontaminating;thereby minimizing cross <br /> contamination due to sampling devices. Samples will-be'drawn and collected in'such a.manner'that '. <br /> ' agitation and'exposure of the groundwater to the atmosphere is minimal. Sample containers will be: <br /> filled-using-the appropriate disposable-sampling attachment which allows controlled flow out of the �.:. <br /> bottom of the bailer by liftinp <br /> . u on-the check valve. ± <br /> g . <br /> y <br /> 4'.3.4. Sample an <br /> r <br /> _ n -' <br /> Ground water'samples will be,collected into laboratory.supplied containers. Ground water-samples f <br /> °AdrancedGeoEnVironmenISI,Inc. . <br />