My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4040
>
2900 - Site Mitigation Program
>
PR0545496
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 3:24:47 PM
Creation date
3/24/2020 3:09:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545496
PE
2957
FACILITY_ID
FA0003564
FACILITY_NAME
BLUE STAR
STREET_NUMBER
4040
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15727503
CURRENT_STATUS
02
SITE_LOCATION
4040 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Too quick on the key board-Attached is the permit application. <br /> clave <br /> David J. Vossler <br /> Service Group Manager - Remediation <br /> GHD <br /> T: 707-523-1010 1 V: 849954 1 F: 707-527-8679 1 M: 707-477-1283 1 E: Dave.Vossleroghd.com <br /> 2235 Mercury Way, Suite 150, Santa Rosa, California 95407 USA I www.ghd.com <br /> WATER I ENERGY&RESOURCES I ENVIRONMENT I PROPERTY&BUILDINGS I TRANSPORTATION <br /> Please consider our environment before printing this email <br /> From: Dave Vossler <br /> Sent: Monday, March 04, 2013 10:12 AM <br /> To: Johnny Yoakum (iyoakum(-asjcehd.com) <br /> Subject: 4040 E. Main Street Permit Application <br /> Johnny <br /> As requested here is the well/boring permit application you requested. Sorry about the inconvenience,Vicki said I <br /> needed a new permit application but it looked the same as what I had sent in earlier, so I called for some help and they <br /> told me to use the one I submitted. Oops! Hope this is correct,We will be installing the two temporary soil vapor probes <br /> on the 14th and after the collection of the sample,the direct push rods will be removed and the borehole backfilled with <br /> a cement/bentonite grout from the bottom at 5-feet to the surface. <br /> Please call me if you have any questions. <br /> Best Regards <br /> clave <br /> David J. Vossler <br /> Service Group Manager - Remediation <br /> GHD <br /> T: 707-523-1010 1 V: 849954 1 F: 707-527-8679 1 M: 707-477-1283 1 E: Dave.VosslerCcb4hd.com <br /> 2235 Mercury Way, Suite 150, Santa Rosa, California 95407 USA I www.ghd.com <br /> WATER I ENERGY&RESOURCES I ENVIRONMENT I PROPERTY&BUILDINGS I TRANSPORTATION <br /> Please consider our environment before printing this email <br /> This email and all attachments are confidential. For further important information about emails sent to or from <br /> GHD or if you have received this email in error, please refer to http://www.ghd.com/emaildisclaimer.html . <br /> This e-mail has been scanned for viruses by MessageLabs. <br /> This e-mail has been scanned for viruses by MessageLabs. <br /> This email and all attachments are confidential. For further important information about emails sent to or from <br /> GHD or if you have received this email in error,please refer to http://www.ghd.com/emaildisclaimer.html . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.