My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4040
>
2900 - Site Mitigation Program
>
PR0545496
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 3:26:09 PM
Creation date
3/24/2020 3:13:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545496
PE
2957
FACILITY_ID
FA0003564
FACILITY_NAME
BLUE STAR
STREET_NUMBER
4040
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15727503
CURRENT_STATUS
02
SITE_LOCATION
4040 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bentonite between the sand pack and the hydrated bentonite is to preclude Temporary Soil Vapor Wells: Post-run tubing and drive point methods' <br /> the hydrated bentonite grout from infiltrating the sand pack. Follow a similar used to create temporary soil vapor wells are not recommended for soil gas <br /> procedure for deep well construction with multiple probe depths,in that one sampling(McAlary,et al,2009). The tubing used to create temporary soil <br /> foot of dry granular bentonite should be emplaced on top of the sand pack vapor wells for the post-run method is prone to sealing issues associated with <br /> encasing each probe,followed by hydrated bentonite grout. The hydrated connecting the tubing to the drive point. Additionally,the drive point probes <br /> bentonite grout should continue until the next sand pack,as shown on Figure may be deflected by cobbles,which can create gaps between the outer wall <br /> 2. A cement/bentonite mixture in accordance with California well construction of the casing and the geologic materials that are difficult to observe and <br /> standards may also be used above the dry bentonite layer to seal the equally difficult to seal. A hydrated bentonite plug at ground surface does not <br /> borehole annulus. stop communication along the outer wail of the casing between different <br /> depth intervals. Samples collected under these circumstances will draw soil <br /> C. A tremie pipe should be used for soil vapor wells deeper than 15 feet,to avoid gas primarily from the most permeable layer above the tip of the probe which <br /> bridging or segregation during placement of the sand pack and bentonite seal. may introduce a significant bias. Moreover,this condition cannot be identified <br /> by any tracer applied at or near ground surface. Temporary soil vapor wells <br /> D. The use of a down-hole probe support may be required for vapor wells in may also yield questionable results in moderate to low permeability soils such <br /> excess of 40 feet bgs. The probe support may be constructed from a one- as clay and/or silt clay lenses,where the Flow of gas through the geologic <br /> inch diameter bentonite/cement grouted PVC pipe or other solid rod,or materials is low. In such case,soil gas will be.collected from the path of least <br /> equivalent,allowing probes to be positioned at measured intervals prior to resistance at any depth along the drive shaft. <br /> installation. The support should be solid or properly sealed to avoid possible <br /> cross contamination or ambient air intrusion. Alternative probe support Equilibration Time <br /> designs with accompanying descriptions may be proposed in the project <br /> workplan. Justification should be included in the project workplan if the Subsurface conditions are disturbed during probe placement. To allow for <br /> project proponent chooses not to use probe support for deep vapor wells. subsurface conditions to equilibrate and vapor concentrations to stabilize,the <br /> following procedures are recommended: <br /> Tubing Protection: Tubing should be protected from damage or clogging <br /> from subsurface soil materials by placing the tubing inside a Flush-mount 1. For soil vapor wells installed with the direct push method,do not conduct the <br /> casing. For deep vapor wells ensure the probe tip and tubing are properly purge volume test,leak test,and soil gas sampling for at least 30 minutes <br /> placed and tubing is not damaged or kinked. Properly mark tubing at the following vapor probe installation. <br /> surface to identify the probe location and depth. <br /> 2. For soil vapor wells installed with hollow stem or hand auger drilling methods, <br /> Soil Gas Well Completion: Soil gas wells should be properly secured, do not conduct the purge volume test,leak test,and soil gas sampling for at <br /> capped and completed to prevent infiltration of water or ambient air into the least 48 hours after vapor probe installation. <br /> subsurface and to prevent accidental damage or vandalism.For surface <br /> completions,the following components may be installed: 3. For soil vapor wells installed with the rotosonic or air rotary method,do not <br /> conduct the purge volume test,leak test,and soil gas sampling until it can be <br /> a. Gas-tight valve or fitting for capping the sampling tube; empirically demonstrated that the subsurface equilibrium time is sufficient for <br /> representative sample collection. <br /> b. Utility vault or meter box with ventilation holes and lock; <br /> Vapor well installation method and equilibration time should be recorded in <br /> c. Surface seal;and the field log book or field form. <br /> d. Guard posts. Decontamination <br /> Decontaminate all reusable equipment to prevent cross contamination. <br /> I Drive point methods may be appropriate for certain site conditions or circumstances depending on DQOs.The use <br /> of post-run tubing should be discussed with the Agency prior to inclusion In the workplan. <br /> 3/3/2010 -21- 3/3/2010 -22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.