Laserfiche WebLink
Figure C-1: Example Apparatus for Field Screening and Sampling using Helium Tracer APPENDIX D <br /> SOIL GAS SAMPLING IN LOW-PERMEABILITY SOIL(EXAMPLE) <br /> Shroud <br /> Flow Controller and Soil-Gas Probe Design and Construction:The following is an example of the probe <br /> 5 Micron Filter construction and design,which may be used for collection of soil gas from a low- <br /> ---- -- - permeability soil. Alternative designs may be acceptable;however any probe in low <br /> permeability material should meet the following conditions: <br /> Summa canister <br /> Pump 1. Probes installed in a cored borehole(e.g.,Geoprobe Dual Tube 3.25-inch <br /> Helium meter diameter core barrel system(DT325),or similar); <br /> monitoring port ` 2. Probes constructed of clean inert materials(i.e.,Teflon, PEEK,nylon); <br /> 3. Probes having a sand filter pack around the probe tip with a pore volume of <br /> Lung Box about 1 L <br /> 4. Probes having an annular seal of well-hydrated bentonite and <br /> 5. Probes having a ball valve with compression fitting(e.g.,SwagelokTM'),or <br /> -Tedlarr Bag Teflon's-taped threaded fittings on the top. <br /> t <br /> Soil Gas/—,--,*' <br /> as/ If lithology with low permeability is anticipated,a continuous core should be collected <br /> Sub-Slab Probe and visual inspection of the core should be performed to assess the moisture profile and <br /> the probe screen should be installed at a depth above the capillary fringe. Laboratory <br /> Helium Addition Point analysis of the grain size distribution(sieves and hydrometer)and moisture content in <br /> selected samples from the soil core is also recommended. <br /> Soil Vapor Well Emplacement Method: In this example,a screened tip(e.g., <br /> - Geoprobe®6-inch permanent implant screen with conical stainless steel tip)is used <br /> References: attached via compression fittings to the'/4-inch tubing. As a precaution,the implant <br /> screens are soaked in isopropyl alcohol and oven-dried to remove any cutting oils. An <br /> McAlary,T.A.,P.Nicholson,H,Groenebelt,D. Bertrand.2009.A Case Study of Soil- equipment blank sample(i.e.,blank air sample)is collected from a fully assembled <br /> pp.144. probe prior to subsurface installation to identify any target analytes that may be <br /> &Remediation,29,no:1, p.14 <br /> Gas Sampling in Silt and Clay-Rich(Low-Permeability)Soils,Ground Water Monitoring attributable to contaminant from the equipment. <br /> USEPA. 1996:United States Environmental Protection Agency, EPA Publication SW- The well design described below is a modification of the design in main text. In this <br /> 846,Test Methods for Evaluating Solid Waste,Physical/Chemical Methods 0040, example,filter sand is installed in the bottom of the borehole before the probe is <br /> Sam � o Principle Organic Hazardous Constituents from Combustion Sources Using inserted,then sand is added to surround and extend above the screen. The total <br /> Tedlar Bags:National Technical Information Services,U.S. Department of Commerce. volume of sand should be sufficient to provide a pore volume of at least 1 L,assuming <br /> Springfield,VA, December,Technical <br /> Section on S Figure 1 40%porosity. For a 3.25-inch diameter borehole,this corresponds to a filter sand <br /> Spri gwww.VA, December, <br /> r,199 azwa tion .1.2, Figure df) interval of about 18 inches. Above the filter sand,3 to 6 inches of dry granular bentonite <br /> (httiis placed to trap any liquid that might separate from the overlaying bentonite slurry or <br /> the water used to seal the borehole annulus. The bentonite seal should preferably be <br /> mixed as slurry. The actual volume of slurry added to the borehole should be verified to <br /> be equal to the calculated volume of the annular space between the probe tubing and <br /> borehole wall. Alternatively,the seal may be placed using alternating lifts of water and <br /> granular bentonite,provided that a tamping rod is used to facilitate mixing of the two <br /> components in-situ. A bolt-down flush-mounted casing or a well box should be installed <br /> as a ground surface completion. <br /> 12/10/2009 _59- 12/10/2009 -60- <br />