My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4040
>
2900 - Site Mitigation Program
>
PR0545496
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 3:26:09 PM
Creation date
3/24/2020 3:13:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545496
PE
2957
FACILITY_ID
FA0003564
FACILITY_NAME
BLUE STAR
STREET_NUMBER
4040
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15727503
CURRENT_STATUS
02
SITE_LOCATION
4040 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> Page <br /> 1.0 Introduction.................................................................................................................................2 <br /> 1.1 Objective...........................................................................................................................2 <br /> 1.2 Site Description.................................................................................................................2 <br /> 1.3 Site History.......................................................................................................................2 <br /> 2.0 Proposed Tasks............................................................................................................................3 <br /> 2.1 Pre-Field Activities...........................................................................................................3 <br /> 2.2 Drilling and Monitoring Well Construction Activities.....................................................3 <br /> 2.3 Soil and Groundwater Sampling and Analysis.................................................................4 <br /> 2.4 Monitoring Well Development.........................................................................................4 <br /> 2.5 Soil Gas Probe Installation ...............................................................................................4 <br /> 2.6 Soil Gas Sampling and Analysis.......................................................................................5 <br /> 2.7 Groundwater Monitoring Well Survey.............................................................................5 <br /> 2.8 Quarterly Groundwater Monitoring, Sampling, and Reporting........................................6 <br /> 2.9 Sensitive Receptor Survey................................................................................................6 <br /> 2.10 Quality Assurance/Quality Control ..................................................................................6 <br /> 3.0 Site-Specific Safety Plan.............................................................................................................6 <br /> 4.0 Report of findings........................................................................................................................7 <br /> 5.0 Anticipated Schedule...................................................................................................................7 <br /> 6.0 Distribution..................................................................................................................................7 <br /> ATTACHMENTS: <br /> FIGURES <br /> Figure 1 —Vicinity Map <br /> Figure 2— Site Map <br /> Figure 3 —Extent of Petroleum Hydrocarbons in Groundwater, April 14, 2010 <br /> Figure 4—Proposed Monitoring Well Construction Details <br /> APPENDICES <br /> Appendix A—Historical Site Data <br /> Appendix B— Standard Operating Procedures <br /> Appendix C—DTSC Guidelines <br /> Appendix D— Site-Specific Safety Plan <br /> 03009-10016-37020 i WINZLER&KELLY <br /> August 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.