My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:56:43 PM
Creation date
3/24/2020 4:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RED JACKET PUMPING SYSTEMS DELIVERwk <br /> From installation'to service requirements, these pumps are designed to keep <br /> pumping longer with less maintenance. Vapor locking is eliminated. <br /> Our track record speaks for itself. For over 30 years, Red Jacket has provided <br /> the highest quality products and services for the petroleum industry. This dedi- <br /> cation and experience is in every product— 6ecause you deserve the 6est. <br /> Red Jacket's commitment to service is unparalleled in the petroleum industry. <br /> Behind every Red Jacket product are quality minded people. <br /> Motors are availa6le in single phase 200-250 volt 50 cycle, 208/230 volt 60 <br /> cycle and three phase 380-415 volt 50 cycle. Single phase units carry U.L. <br /> Listing. <br /> Design Features: <br /> >) One small assembly contains all the D Tank test port and line test port used in <br /> funcfional elements of the pump: the testing are conveniently located on top <br /> check valve, air eiminator, expansion of the discharge manifold. <br /> relief valve, siphon nozzle and venturl, >> Disc6arge seal design feature directs <br /> siphon check valve and the pressure test <br /> screw. This enfire assembly can be product leakage back into the storage <br /> removed as a unit by removing two tank. <br /> machine screws. These, plus the capaci- >> On winding <br /> tor and electric disconnect, can easl� thermal overcurrent <br /> be reached by removing the manhole <br /> protector prevents premature <br /> cover. motor failure due to overheating. <br /> D Optional Red Jacket Leak Defector The permnent split capacitor motor for <br /> detects pressure leaks between the single phase gives you the option of <br /> pump and the dispensers. Fits conve- using a control box or wiring direct. <br /> nient� in top of pump. A special kous- <br /> ing is available so that the leak detector Red Jacket's impellers and diffusers are <br /> may be used in line for manifolded manufactured to reduce vibration and <br /> pumping. wear, provide longer pump and motor <br /> >> All models fit standard X' NPT, or BSP life, thereby reducing maintenance <br /> costs. <br /> tank openings. <br /> D Hydraulically balanced impellers float <br /> D Bayonet type electrical connector pro- on a 16 tooth, stainless steel, splined <br /> Yides a safe, explosion-proof electric shah, providing a positive and evenly <br /> disconnect without separating any distributed drive. <br /> wires. <br /> )> Pressure testing lines are easy because <br /> the relief valve and check valve can be Red Jacket Davenport is an <br /> isolated, ISO 9001 quality company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.