Laserfiche WebLink
F ,7f� <br /> 0 <br /> z <br /> MATERIAL AND WORKMANSHIP OWNER SUPPLIED EQUIPMENT z <br /> Ld <br /> L UNLESS 0THERWI5E &FEC',IFICALLY PROVIDED IN THESE r,-,)0GUMENT6, ALL I(o� GOVERNING CODES AND STANDARD6 INCLUDE, BUT SHALL NOT 5E LIMITED 5� VENT/VAPOR PIPING� REID TI-4READ IIA AND RED I-HREAD ii LurrH CONTRAcToRaARE Ar.)VI6E1:) TO CONFIRM OWNER 51JPPLIEt�) Ld <br /> EaUIPMENT, MATERIAL, AND ARTICLE6 NcoRF:,oRATEp IN THE LUOf;pj< TO, THE STANDARDS OF THE FOL.LOLL1IN6;- FITTING5AND D5-1000AND D6-0000 5ERIE5 ,4DHE61VE, OR AMERON EQUIFIMENT WITH OWNER, z <br /> COVERED e"r THF-SE DOCUMENT5ARE TO BE NEW AND OF THE MC5T5I,,JITAF5LE F,)UALOY 3000/LCX WITH ALCOHOL FITTINGS AND P5X34 ADHE61VE, <br /> z <br /> GRADE FOR THE PROCES5 INTENPED. UNIFORM FIRE COIDE (UPC) DO NOT MIX DIFFERENT MANUFACTURER'B MATERIALS. z <br /> AMERICAN NATIONAL STANDARDS IN5TITUTE (ANSI) 0 <br /> 2� THE CONTRACTOR 5HALL FURNI16H TO THE OWNER'5 AGENT FOR HIS AMERICAN PETROLEUM INSTITUTE (AFI) C� FER50N5 INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN 11-- 6 fy <br /> APPROVAL THE NAME OF T�4E MANUFACTUREKTHE MODEL NUME3ER, AND AMERICAN BOCIETY FOR TE5TIN6s AND MATERIAL5 (ASTM) TRAINED 5Y MANUFACTURER. 4 a, o <br /> OTHER IDENTIFYING IDATA AND INFORMATION RESPECTING THE UNFORM F3UILDING CODE (U5C) _ ,q <br /> PERFORMANCE, CAPA51LITY, NATURE, AND RATING OF THE MACHINERY AMD NATIONAL ELECTRIC. CODE (NEC) D- STEEL PIPE- ALL METAL PIPING $HALL 5F_ 5LACK IRON SCHEDULE <br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATE5 NATIONAL �=IRE PROTECTION AGENCY (NFFA) 40, OR EXTRA STRONG. GALVANIZED PIPE 11,5 NOTALLOWED, FITTINGS <br /> INCORPORATING IN THE WORK WHEN REaUIRED 5Y THE OWNER',E? AGENT. UNDERWRITER'$ LA50RATORIES, INC. (UL) SHALL 5E 300 P51' MALLEA15LE IRON. <br /> CALIFORNIA REGULATION8 <br /> 3� WHEN R,EaUiRED i5Y THE5E DOCUMENT5 OR WHEN CALLED FOR 5Y THE LOCAL ORDINANCES F_ ALL. STEEL PIPE 5EL.OW 6:tRADE 16 TO 5E r.-)OU5LE WRAPPED WITH 20 <br /> OWNER'$ AGENT, THE CONTRACTOR SHALL FURNISH 'THE-: AGENT POR MIL. PVC PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL <br /> APPROVAL FULI_ INFORMATION CONGE RNING THE MATER,IAL OR ARTICLES 11 SAFETY PLAN� CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE TAFES, ANID 5HALL 5E BY THE SAME MANUFACTURER AS THE WRAP. <br /> WHICH HE, CONTEMPLATES INCORPORATING IN THE LJORK, WHEN 60 DURATION C4= THE CONTRACT A SITE HEALTH 4 SAFETY PLAN THAT WILL <br /> DIRECTED, SAMPLES MAY 5E 6U51"'ITTED FOR AF'f=ROVAL AT THE EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, F: ALL THREADED CONNECTIONS SHALL 5E THREADED WITH SEALANT <br /> CONTRACTOR'5 EXPENSE, WITH ALL SHIPPING CHARGE5 PREPAID. AND, WHICH 6HALL BE CURRENTL'Y" WARRANTE[�) 5Y MANUFACTURER FOR FULL <br /> COMPATI51LITY' wiTH THE PIPING MATERIAL USED, AND FOR USE WITH <br /> A; APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 OUALIFIFED PETROLEUM 6OLVENTS, FUEL5, 011-5, DIE5EL, AND 1005. METHANOL, WHICH ul <br /> 4� MACHINER-T'-, EOUIPMENT, MATERIAL, AND ARTICLE$ IN61-AL-LED 01R, USED ul <br /> WITHOUT REaUIRED APPROVAL $HALL 5E AT THE RISK OF 6U56EaUF_NT AND AUTHORIZED TO SUPERV15E AND ENFORCE COMPLIANCE WITH THE SHALL 5E VERIFIED E3Y CURRENT MANUFAGTURER'6 PRODUCT DATA 6HEET. <br /> Z <br /> 1 <br /> HEALTH AND 6AFETIr' FLAN. 6U5MIT THE NAME AND QUALIFICATION5 OF <br /> u] (p <br /> 'THE SA��-T)` OFFICEF-2, TO THE OWNER'S AGENT PRIOR TO COMMENCING WORK G� G.C� 014ALL MEMONSTRZATE TO OWNERS REPRESENTATIVE THATALL UJ > q <br /> _<�r Ll ' <br /> 5, ALL. WORK TO 5E DONE IN ACCORU�),4NCE WITH AFFLIC-A51LE CODE,5 AND ON THE 51TE. MATERIALS ARE NEWAND CONFORM TO AL30VE SFIECIFICATION5, LU (Z 1 0 <br /> REGULATIONS. ui _ v , " I <br /> mi x c() 1--l- <br /> 5: THE FLAN E�,HALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE IL DO NOT PLACE PRODUCT PIPING UNDER 5UILDING5. FIFING RUNS OVER -- if) <br /> 9?, ALL �­IATESDIAL.6 6HALL 5F_ IN5TALLED PER r"IANUFACTURER',15 IN5TRUCTION5 NUM5ER5 OF THE O�UIF-ERVI$ORT' f-ER,�ONNEi-, THE HOSPITAL FACILITIES TANKS SHALL 5E MINIMIZED. MAINTAIN MINIMUM CLEARANCE 45 REa'D. 5Y n �j <br /> AND THESEE DOCUMENTS. CONFLICT5 ,15HALL 5E BROUGHT TO THE ATTENTION NEAREST THE SITE, AND A MAP TO THE HosF:,rrAL, PROCEDURES SHALL BE MNFR, MINIMIZE C-RO85ING OTHER LINES AND CONDUIT. IF PIPING <br /> UJ 3: CD Y_ <br /> (.7, - THE OWNER'5 A6sENT/F=NGINEF_R, WRITTEN IN THE PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODOR$ 16 NOT 5HOWN ON SITE PLAN, G.C. SHALL RUN LINE6 THE M05T DIRECT <br /> OR HAZARFDOU5 6U55TANCE5 5E UNCOVERED. ROUTE 6UIF�JECT TOAFFIROVAL BY OWNER'S REPRESENTATIVE. 0 ul Q) uj <br /> 1. IF ANYOF THE5E DOGUMENTES INDICATE A CONFLICT WITH THE 6TATE OR <br /> LOCAL REaUIREMENT5 A6 ARE cURIRENTLY IN �_=FFECT AT THE TIME OF THIS C. IF, DURING THE COURSE or- THE WORK, UNSAFE CONDITION6 DEVELOP 12. PIFING SYSTEM$ 8HALL BE TESTED PER CURRENT MANUFACTURERS kl."-r <br /> f-- ROJECT, IT 15 EXPECTEDTHAT THE M06T RE5TRICTIVE C;0NDITI(,)N(6) OR ARE ENCCUNTEREL-), TAKE IMMEDIATE MEASURES TO CORRECT THE INSTRUCTION6 SHALL 5E FOLLOWED AT ALL -rimE5, AND SHALL HAVE <br /> WOUL�) APPLY. CONDrricN. IF THE CORREcTivE ACTION [6 INSUFFICIENT IN THE PRECEDENCE OVER OTHER INSTRUCTION$. <br /> OPINION CF ­r�4E CWNER',SAGENT, GONeTRUCTION WORK 5PALL CEASE UNTIL <br /> C-ORREcTivr= ACTION (.'.'.AN BE IMPLEMENTED. k GZ. TO NOTIFYOWNER'5 REFRE6ENTATIVE TWO WORKING DAYS PRIOR <br /> GENERAL CONDITIONS TO LINE TESTING. OWNER'6 REP, (5HALL wrrNE5S ALL LINE TESTING AT Hie/HER, 9), 1.11 <br /> D�� PROVIDE A MINIMUM OF TWO FIRE EXTINGU15HER'5 WITH A MINIMUM DISCRETION. MARK TEST PRE66URES ON GAUGE WITH EI-ECTRICAL TAFIE AT F (o <br /> 7- <br /> 1, CONTRACTOR EMPLOYEE5 "TO HAVE COMPLETED 40 �.40UR5 05HA "TRAINING CLA65 RATINC�s OF 2-420­5�C, WITHIN F�0 FEET OF THE OPERATION. 5EGINNING OF TESTS. F`RE8SURE SHALL HOLD FOR AT LEA6T ONE (1) <br /> COURSE PRIOR TO THE START OF WOW, CERTIFICATION OF THIS MU&T 13E HOUR AND F5E WITNESSED 5Y OWNER'5 REr-RE6E-NTATIVE. DO NOT 5ACKFILL <br /> PROVIDED TO 'THE OWNER'$ ENGINEER PRIOR TO THE 5TAiR'r OF wo rRK, 15, LIND ERGROUND 8ERvIcE ALERT (U.5,A�) - THE coNTRAcTOR 5HALL NOTIFY TRIENCHF-15 UNTIL AUTHORIZED BY OWNF-R'5 RE-PRE6ENTATIvE. <br /> MEM15ERES OF U5,A� 2 FULL WORKING DAY5 IN ADVANCE OF PERFORMING <br /> 2. GONTRACTOrREMPLOYEE5 TO HAVE COMPI-ETEE) THE PIPING MANUFACTURER'$ ANY EXCAVATION WORK 5YCALLINGTHE TOLL-FREE ONE.-CALL PROGRAM 5: TEST PRE65URECP 5HALL 5E� <br /> TRAINING Ri"EQUIREMENT6 IN ACCORDANCE WITH CALIFORNIA U5T NUM5ER (000) 22-1-2600. 2" - 50 P51 AND AF`FI_`r' SOAP 5OLUTION. <br /> REGUL/_\TIONS. CERTIFICATES SHALL 5E PROVIDED TO OWNER, 3'' - 40 1=51 AND APPLY 60AP SOLUTION. <br /> CONTRACTOR ,','�HALL COMPLETE THE PIPING INSTALLATION CHECKLIST 3'' - SECONDARY - E) PSI AND APPLY SOAP SOLUTION. <br /> SUPPLIED PIPING MANUFACTURFR AND 6HALL PURNISH THE CHECKLiS,r TO PETROLEUM WORK SCOPE <br /> OWNER� C. CAUTION- DISCONNECT FLEX CONNECTOR FROM 5TP AND CAP PRIOR <br /> L PRIOR TO THE 5TART OF WCR<, PROVILDE OUNER WITH WORK rLAN AND TO TESTING., APPLY 4 SZELEASE PRESSURE SLOWLY. VENT/VAPOR, SYSTEM u-1 <br /> 3. GONTRAcToR TO HAVE 5EEN TRAINED AND CERTIFIED 5'T' THE TAN< 5CHEDULE THAT COORDINATE6 5CHEDULING WITH OTHER i=cRTION5 OF SHALL 5E TE5TED FROM TOP OF VENT, THROUGH MANIFOLD($), EXTRACTOR <br /> TALLATION IN ACCORDANCE WITH THE FIROJECT TO TPE FULLEST EXTENT P05515LE, E -OR <br /> M4NUFA(.TuR.F'R IN CORRECT TANK IN6 eASE AND RISER, STAGE I CONTAINMENTMANHOLE6, 5TAC - 11 VAr <br /> CALIFORNIA U5T REGULATION15. CER'TiFicA­rE6 5�1-4ALL 5E PROVC)ED To LINES TO ISLANDS AND STAGE 11 FLEX CONNECTORS AT r_')I,5FEN,5ER(5)� )7 <br /> ft'. <br /> OWNER. CONTRACTOR 5HALL COMPLETE THE TANK lN5TALLATION CHECI<_15T 2. G,C,, SHALL FENCE OFF WORKAREA WITH (o' HIGH CHAIN LINK FENCE. F106T "KEEP ...... <br /> 13UPFL <br /> _IEP. TANK MANUr-ACTUREIRI AND SHALL PLIF,Ni6H THE CHECKLIST To OUT" 6IGN6 ON F�_NCE EVERY 30 FEET. AT THE END OF EACH LJORK DAY D. SLOWLY PRESSURIZE FRODUCT LINES AND VENT/VAF:'GR ,5Y5TEM TO 50 <br /> oa,�E_R_ SECURE FENCING PANELS TOGETHER, P51. 5OAP ENTIRE PIPE SURFACES INCLUDING JOINT,13 AND FITTINGS, 0 tu <br /> CORRECT ANY LEAKES AND RETEST. <br /> 4. CONTRACTcR TO DEVELOP A 6FECIFIC SITE SAFETY PLAN FOR TANK 3, EXCAVATE AS NECE56ARY FOR THE IN5TALLATION OF NEW TANK5, j <br /> IN5TALL.ATION PRIOR TOTHE 5TART OF WORK. E. SLOWLY RELIEVE PfRE65URE FROM VAPOR/VENT 5Y5TEM AND REMOVE <br /> coNTRACTOR WILL CONDUCT WEEKLY J055ITF 6AFETY MEEETINC-45 LUTH IT's 4. WHEN 1,5011- 15 TO 5E 5TOCKPILED ON 51TE FOR 5AMPLING PRIOR TO OFF-HAUL, PLUG FRO�l EACH EXTRACTOR AFTER TEST, REDUCE PROL%CT LINE <br /> EMFLOYEE5 AND THE MEETING MINUTES WILL. BE SUPPLIED To OWNER. CONTRACTOR 5HALL PLACE EXCAVATED 501L ON AND SHALL COVER WITH 4 PRE65URia- TO 95 PSI. MONITOR DAILY UNTIL ALL, YARD PAVING IS <br /> 5, CONTRACT05Z 5HALL HAVE THE FOLLOWING L[GEN5E6- MIL. PLASTIC UNTIL SOIL 15 REMOVED, IN AREA AFFROVED COMPLETE, <br /> 5Y OWNER / G,r— R SECONDARY P IPE MUST E3E PROPERLY" CUT. INSPECT ALL PRIMA RY z I u <br /> 144 CiENERAL ENGINEE-,RING PIFE SURFACES. PRE65URIZE 5ECONDARY PIPE TO F� P51 AND 60AFIALL 07-3 <br /> r7elm mmm6m�D�, � <br /> b, G.C, 5HALL PROVIDE FOR D15TR15UTION Or- Al-L <br /> 5, HAZARDOU6 MATERIAL 5U55T4N(7,E HANDLING PIF->E SURFACE AND FITTING5, PRE86URE ON THE 5ECONDAR"r" <br /> EXCAVATED SOIL, PER GENERAL f-,RcjEc­r REOUIREMENT5. <br /> 5FACE SHALL 5E MAINTAINED, UNTIL AFTERTHE PAVING 15 N PLACE OVER <br /> rp. CONTRACTOR 6HALLHAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL TANK FIELD AND PIPING RUN5, ANI�) SHALL. 5E WITNE68ED 5Y THE OWNER'S, A) !-3 <br /> HAVE PROOF OF 16UGH N6URANCE ON FILE WITH OW'�EFR BY NAMING OWNEIR (o, IN,5TALL "TYPAR" FILTER F,45RIG, LINER IN TANK HO�_E AND TRENCHES FER, REPRE5ENTATIVE. 0 () (� <br /> A5 "ADDITIONAL INSURED"� r.)fRAWING6, WHERE REQUIRED 5Y WET-HOLE CONDITIONS, FROVIE)E TANK ®R) kn <1 <br /> HOLD-DOWN5 AS RECUIRED BY MANUFACTURER IN WET-POLE CONDITIONS. G. AFTER. OEING WITNESSED 5T' OWNER'S REPRESENTATIVE, REMOVE 74 <br /> I . o z <br /> A. 5TATUTCRY WORKMAN'5 COMPREHEN51VE LIA51LITI" PREESSURE FROM PRODUCT LINES AND AIR FROM SECONDARY LINES AFTER 1-11 cy 0 <br /> T INSTALL TAN<5 PER, DRAWINGS AND CURRENT MANUFACTURER'$ IN6TRucTION,5, PAVING IS IN FILA CE f-j3 () C) <br /> -HL 'NF TH A COM N WHICH 5HALL E3E FOLLOWELD AT ALL TIMES, AND SHALL HAVE FRECEDENCE - 6 <br /> 5� COMFRf :N,15IVE GE _RAL LIAE51LIT WI 51 El:) $INGLE <br /> LIMIT OF NOT LE65 THAN $1,000,000 PER OCCURRENCE FOR eODILY OVEFIR OTHER IN5'"i-RucTioNe. MANUFACTURER'_5 CHECKLI5T5 6HALL 5E 13� G.C. 5HALL. PERFORM FRF-CI51ON TEST ON PRODUCT LINES AFTER PAVING E3 <br /> INJURY' AND PfRoPERrr DAMAGE. COMPLETED 5"r' THE CONTRACTOR, AS EACH STEP 16 COMPLETED. 15 CIOMPLETE AND PRIOR TO FINAL PROJECT ACCEPTANCE. FIREC16ION Fk- --A <br /> La 0 z <br /> TANK 5EDDING AND 5AG<FI1.._L TO 5E PEA GRAVEL. TAN< 5EDDING 16 TO 5E LINE TEST ,.-,HALL BE IN ACCORDANCE WITH NFFA 32e, LOCAL <br /> v <br /> C. AUTOM051L.E LIA51LITY COVERING U&E OF ALL OWNPID HIRED A MINIMUM 12". TANK INTEGRITY TESTING 8HALL CONFORM TO MNPR'5, FREQ'6. REaUIREMENT8, OR APPROVED EaU4L_ TF-81" SHALL 5F_ CONDuCTED 5Y A V (f) <br /> VEHIGLE6 WITH A G,01`15INED 5INGLE LIMIT OF 5INGL_E UNIT OF LIA51LIT'Ir' CONTRACTOR5HALL NOTIFY OWNER'6 REPRESENTATIVE TWO WORKING PA"r'5 CERTIFIED TESTER. G,C. 514AI-L F11POVIDE WRITTEN REPORT OF PREC-16ION z <br /> OF N(-,)T LESS THAN fl,000,000 FER OCCURRENCE- FOR r5ODILY INJUR�- AND PRIOR TO TANK ARRIVAL. OWNERS REP. 5HALL WITNE65 ALL TANK, TESTING TEST TO OWNER'S REPRE5ENTATIVE PRIOR TO OWNER'$ ACCEFTANCE OF <br /> PROPERTY DAMA6;E, AT H15/HER P16(.-,RETICN� PROJECT. <br /> 1, CONTRACTORTo FURN15H ALL LA50F:,, MATERIAL, EQUIPMENT, AND a� FETROL CONTRACTOR TO N6TALL NEW PETROL ELECTRICAL SYSTEMS PER 14� CONTRACTOR SHALL PROVIDE DOCUMENTATION OF A DYNAMIC 5ACKPRF55URE <br /> 6ERVICE6 NECE85AR"r' FOR OR REA,50NA5LY INCIDENTAL TO 'THE PLANe AND MANUFACTURER'$ REQUIREMENTS. ARRANGE I'=ORALL TEST OF ALL VAPOR RETURN LINESA5 REQUIRED 5Y LOCAL REGULATIONS. <br /> 5AT15FACTOR)" COMPLETION OFALL WORK 5HOWN ON, CALLED FOR, OR N8PECTION5. PROVIDE CONDUIT6/WIRING, J­50XE6, ETC, RE-QUIRED FOR <br /> REQUIRED 6YTHE DRAWINGS, �-,.xcE�P,r AS NoTf---D f3Y OTPERS� COMPLETE ELECTRICAL 6YSTEM6. 15,� CONTRAc-raR 6HALL DO ANY OTHER TESTING AS REQUIRED f3Y LOCAL <br /> 5. ALL WORK 6HALL 5E PERFORMED IN ACC0FJ,">AN(;E WITH THE UNIFORM e� N5TALL. EQUIPMENT 46 LISTED IN OWNIER'S EaUIPMENT L16T AND PROVIDE REGULATIONS., <br /> AND INSTALL ALL OTHER EOUIFIMENT AS, REQUIRED TO PROVIDE A <br /> 5UILDING CODE, UNIFORM FIRE CO[�)E, NATIONAL ELECTRICAL CODE, COMPLETE PETROLEUM SYSTEM. 1(o. CON5TRUCT NEW F-UEL 15LAND6 A$ SHOWN ON DRAWINGS. <br /> CALIFORNIA UNDERGROUND STORAGE TANK RECiULATIONS, 05HA <br /> CON5TRUC'TION 5AFETY ORDERS, ANI'�) ANY OTHER APFL[C_A5LE 6TATE, CITY, 10, PROVIL")E AND INSTALL NEW PRODUCT, VEENT, VAPIOR, AND SECONDARY IT DI8F`EN5ER AND TUR51NE 5UMP6, AND OVERFILL- 5OXE5 ARZE TO 5E > <br /> OR COUNTYORDINANCE-5. CONTAINMENT LINES FIER DRAWINGS. CURRENT MANUFACTURER'S COMPLETELY SEALED AND TESTED PER CURRENT LOCAL. RE-aUIREMENTS, fli <br /> 1�)� ALL FERMIT6 TO 5E 5EGURED 5�f' OWNERAND 5UPPLIEP TO N&TRUC.TION6 SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE AND EVIDENCED 5`r' OWNERS REPRESENTATIVE. MINIMALLT': I y <br /> pop -F 5. -TURF <br /> COMP <br /> FIE -1-117' PRECEDENC.- OVER 6THER IN61'Ruc-i-ION, MANUFAG R'S CHECKLI&TS <br /> CONTRACTOR, WHO 16 RESPON515LE ING WITH AL-L F11 SHALL 5E COMPLETED F3Y THE CONTRACTOR, AS EACH STEP I$ COI`IIPLETED� L FILL W!'"'14 WATER TO HIGHEST PENETRATION. <br /> CONDITION6� 2� SPRAY FAINT TOP OF WATER. <br /> 10. CONTRACTOR 6HALL V161T 51TE AND FAMILIARIZE HIMSELF OF A; fRqz)ycT FifiNcs� PRIMARYFIFING; WITH CONTAINMENT SYSTEM 10� PROVIDE AND INSTALL coNpurr 4 WIRING FOR PETROLEUM 511r"STEM(5� <br /> ALL EX15TING CONDITIONS r-RIOR TO 5U5MITTING H15 51D. RED Tt4READ IIA AND RED TPREAD 11 WITH FITTINGS AND AS IND). ICATED ON THE DRAWING5, <br /> ID6-1000 AND D5-50006ERIES ADHE,81VE, CRAMERON DUALOY <br /> 11. CONTRACTOR 5HAL.L f=R(,)TE(.-.TALL EX16TIN61 FACILITIES TO 3000/LCx WITHALCOHOL FITTING3 AND FSX.34 ADHESIVE. DO NOTMIX 1'3� Al-L CONDUIT 16 TO eE 3/4" (MINIMUM) RIGID CONDUIT, <br /> REMAIN UNLE56 NOTED OTHERW13E. CONTRACTOR 8HALL REPAIR OR DiF�PERENT MANUFACTU5zZER'S MATERIALS. ALL PIPING AND CONTAINMENT <br /> REPLACE TO THE 6AT16FACTION OF THE CWNEFII�'6 REPRESENTATIVE, ANY 6Y8TEM'5 SHALL 5E UL APPROVED FOR 10090 METHANOL. CONTAINMENT 20� INSTALL MONITORING SYSTEM WITH ANNULAR SPACE FRO5ES, TURBINE AND <br /> 6YSTEM SHALL BE 5Y TPE SAME MANUFA(�TURER, WITH THE 6AME 6ERIE6 i tu EI <br /> EX15TINC--r FACILITIE-6 THA"TARE DAMAGED 5Y THE CONTRACTOR,$ ADHE61VES AND/OR, Fri-TING6. _J, DISPENESER SUMP PR05E,5, TAN< GAUGE5, ALARMS, AND MONITOR CONTROL. <br /> CPERATION5� PANEL IN 5UILD- ING PER DRAWINGS, <br /> uj --I LL LLI <br /> 12. ALL EXCAVATIONS SHALL BE PERJ�--ORMED IN COMPLIANCE WITH OSHA AND 2L INSTALL. NEW DISPENSERS, AND MISC. PETRCLEUM6Y6TEM5, AS INDICATED 0 0 11 <br /> j Z <br /> REGULATIONS. THE CONTRACTOR 15 REF-ERRED To THE .0, SPA ON PLANS AND DE6CR15ED IN THE OWNER'5 EQUIPMENT L15T, n <br /> 6TATE ul 6 11A() <br /> T, "EXCAVATIN6z AND TRENCHING OPERATIONS", FORA 6AFE Wos�< 4 IN) �T j! <br /> 5OCKLE 00 <br /> FRACTICEE5 GUIDE FOR PE11PJ--0RMING EXCAVATION WORK. 22, INSTALL NEW CONCRETE TANK, AND DRIvE 5LAE36 AND OTHER CONCRETE AS 6 ti, �--�7J Ld <br /> INDICATED ON 61TE PLAN. CONCRETE ,�,HALL HAVE A MINIMUM z ff i4,0,9, <br /> UJ � ul <br /> TRACTOR 5HALL. PROVIDE OWNER WITH c-,OMPRE86IVE STRENGTH AT 2�3 DAYS OF 3E,00 P51. CONCRETE 15HAILL "T <br /> 13� UF=CN COMPLETION OF PROJECT, CON <br /> ul Z Cl <br /> IIA5 5UILT11 DRAWINGS OFALL ITEMS INSTALLED BY SAME. "AS 5UILT511 OTHERWISE COMf=L"r' W/ CONCRETE DESIGN AS 5PECIFIED IN CIVIL/ARCH D005. -< z(v y <br /> ILI <br /> 5HALL 5E COMPLF-TED ON-61TE WITH INFORMATION NOTED DIRECTLY ON G�C. SHALL COORDINATE CONCRETE 5LA5 WOR< W1 PETROLEUM CONTRACTOR S)w d(y <br /> - ui z 0: V__ - <br /> _T 44 01,14 <br /> �/_ .", '06 y�) <br /> APPROVED J05 COPY. OR PETROLEUM 5U5CONTRAC;TOR. ILI z a- <br /> coo 0 <br /> Z, W a-11jo <br /> 14. CONTRACTOR 6HALL F-'RCvlr--)E ,4 L15T OF SU5-CONTRACTCR5, IF ANY, WHO 23. FULLY TEST ALI,,- SYSTEMS, AND REPAIRAS NEGE$,SAR�'. -4 6 -3 Ili o z 0 <br /> a OT01 Q T-D <br /> 0 T.-P- (y. <br /> WILL 5E L-6ED ON THE FRojEcT. j�111 <br /> NFL <br /> III (y uj <br /> 15� GONTR4(,-,T0fR 5HALL COORDINATE ALL IN6FECTION5 AND APF`ROVAt_s AND j. <br /> 05TAIN, AT THE COMPLETION OFTHE PROJECT, ALL CERTIFICATES <br /> RF-aUIREF-) TO RUNTHF_ FACII-IrY. <br /> NO, C 8664 <br /> REN. 3-31-05 <br /> "o <br /> cl- PET = 5 <br /> I OP 5HEET& <br />