Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> ar Donna K.Heran,R.E.H.S. Carl Bor man,R.E.H.S. <br /> Director 304 East Weber Avenue, Third Floor g <br /> Mike Huggins,R.E.H.8.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • c.. 1P <br /> Program Manager Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. - Robert McClellon,I�E.H.S. <br /> June 4, 2003 <br /> Program Manager Fax: (209) 4640138 Mark Barcellos,R.�.H.S. <br /> Walton Engineering Inc. <br /> Attn: Michael Walton <br /> PO Box 1025 <br /> West Sacramento CA 95691 <br /> RE: Mr. Cafe 713 N El Dorado Ave Stockton CA 95202 <br /> Your application for permit to install a new underground storage tank system at the above <br /> location has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District <br /> for applicable permits. <br /> 2. Any changes shall be submitted to EHD for approval prior to commencing work. All new <br /> submittals supercede the previous ones. <br /> 3. If the underground storage tank and associated piping are not installed by July 1,2003 then <br /> the new monitoring system requirements and construction requirements under Assembly Bill <br /> 2481 must be satisfied. An addendum to this permit must be submitted and approved prior to <br /> commencing work. <br /> 4. Both primary and secondary pipes shall bear a UL label. <br /> 5. All pipe fittings and connections shall bear a UL label. <br /> 6. All monitoring systems shall be listed on the LG113-16. <br /> 7. All testing shall be in compliance with manufacturer's instruction, section 2635 and section <br /> 2636 of California Code of Regulations (CCR). <br /> 8. Automatic pump shutdown must satisfy CCR 2636(g). <br /> 9. All piping must slope to a containment sump with an audible/visual alarm. <br /> 10. All equipment in contact with backfill must be corrosion protected. <br /> 11. Overfill prevention must satisfy CCR 2635(b)(2). <br /> 12. An accurate and drawn-to scale-as-built plan must be submitted to EHD prior to the final <br /> inspection. <br /> 13. A complete monitoring and response plan must be submitted prior to the final inspection. <br /> 14. All lines and tanks shall be tested for tightness, in accordance to manufacturer's guidelines <br /> by a licensed tank tester and results received prior to the final inspection. <br /> 15. Contact Dina Abate,EHS at(209) 468-3468 for inspections. See inspection checklist for the <br /> required inspections. <br /> 16. All inspection appointments must be scheduled 48 hours in advance. <br /> 17. Note: This permit expires at the end of the 2003 calendar year. If an extension is needed a <br /> written notification must be received by this office prior to December 31, 2003. <br /> Thank you, <br /> 1&�� A�Z& <br /> Dina Abate, EHS <br /> Environmental Health Specialist <br />